Guangzhou University City Distributed Gas power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Guangzhou University City Distributed Gas power station (广州大学城天然气分布式电厂 (Unit 2), 广州大学城华电新能源有限公司二期500MW级燃机热电联产项目 (Unit 2-1), 广州大学城天然气分布式电厂 (Unit 1)) is an operating power station of at least 156-megawatts (MW) in Guangzhou, Panyu, Guangdong, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Guangzhou University City Distributed Gas power station Guangzhou, Panyu, Guangdong, China 23.023378, 113.398392 (exact)[1][2]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 1-1, 1-2, 2-1: 23.023378, 113.398392

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1-1 Operating[3][4] fossil gas: LNG[3][4] 78[3][4] combined cycle[3] yes[5] 2009[3]
1-2 Operating[3][4] fossil gas: LNG[3][4] 78[3][4] combined cycle[3] yes[5] 2009[3]
2-1 Announced[6] fossil gas: natural gas[6][2] 500[6] gas turbine[6][2] yes[6][2]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1-1 Guangzhou University City Huadian New Energy Co Ltd [100%][5][2][7] China Huadian Corporation Ltd [55.0%]; Guangzhou Urban Construction Investment Group Co Ltd [45.0%]
1-2 Guangzhou University City Huadian New Energy Co Ltd [100%][5][2][7] China Huadian Corporation Ltd [55.0%]; Guangzhou Urban Construction Investment Group Co Ltd [45.0%]
2-1 Guangzhou University City Huadian New Energy Co Ltd [100%][5][2][7] China Huadian Corporation Ltd [55.0%]; Guangzhou Urban Construction Investment Group Co Ltd [45.0%]

Background

The first phase (Unit 1 and Unit 2) of Guangzhou University City Distributed Gas power station (广州大学城天然气分布式电厂) officially began construction on July 28, 2008, and achieved commercial operation in October 2009.[8]

Articles and Resources

References

  1. https://web.archive.org/web/20210604192918/https://wenku.baidu.com/view/9770d9defe4733687f21aa05.html. Archived from the original on 04 June 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://www.cers.org.cn/site/content/642aa94698699868ff09ad2919011679.html. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 https://web.archive.org/web/20211121051617/https://news.bjx.com.cn/html/20180906/926153.shtml. Archived from the original on 21 November 2021. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 http://www.insight-cdec.com/product/3.html. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 https://web.archive.org/web/20220406222301/https://news.bjx.com.cn/html/20180906/926153-6.shtml. Archived from the original on 06 April 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 (PDF) http://fgw.gz.gov.cn/attachment/7/7231/7231508/8796160.pdf. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 https://www.qcc.com/firm/8ac4843c3305caf5f1b3ad286d228340.html. {{cite web}}: Missing or empty |title= (help)
  8. "广州大学城分布能源项目". Retrieved 2023-10-27.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.