Guizhou Hexing Metal Products Co Ltd (贵州省和兴金属制品有限公司) is an electric arc furnace (EAF) steel plant operating in Qiandongnan, Guizhou, China.

Location

The map below shows the exact location of the plant in Qiandongnan, Guizhou, China:

Loading map...
  • Location: Jiangshuiqiao, Xingshan Town, Majiang County, Qiandongnan Miao and Dong Autonomous Prefecture, Guizhou Province
  • Coordinates (WGS 84): 26.509525, 107.570458 (exact)

Background

The company plan to build a 70-ton electric arc furnace in 2022 and put it into production in 2023 to replace two 40-ton electric arc furnaces.[1]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Construction date Start date Pre-retirement announcement date Retired date Workforce size Power source
Main plant Operating[2] 2012[2] 117[3] State Grid[4]
Closure Operating pre-retirement[2] 2021-10[5] 2023[5] State Grid[4]
Expansion Construction[6] 2021-10[5] 2022-05[6] 2023[5] State Grid[4]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company GEM ID Owner Owner company GEM ID
Main plant persons [65.0%]; Guizhou Mindong Economic and Trade Co Ltd [35.0%] E100000123261 [98.8%]; E100000001753 [1.2%] Guizhou Hexing Metal Products Co., Ltd.[2] E100000126147

Table 3: Process and Products

Phase Main production equipment Detailed production equipment
Main plant EAF[5] 2 EAF (2x40-tonne)[5]
Closure EAF[5] 2 EAF (2x40-tonne)[5]
Expansion EAF[5] 1 EAF (1x70-tonne)[5]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating
Closure operating pre-retirement 520 TTPA[5][5] 520 TTPA[5][5]
Expansion construction 500 TTPA[5] 500 TTPA[5]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status*
Main plant operating
Closure operating pre-retirement
Expansion construction

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 贵州省和兴金属制品有限公司技术改造升级项目产能置换方案公告,贵州省工业和信息化厅,October 12, 2021
  2. 2.0 2.1 2.2 2.3 https://web.archive.org/web/20220112160118/https://www.qcc.com/firm/ff5a3f7a426d478452c910db862a58ed.html. Archived from the original on 12 January 2022. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20230928130409/https://aiqicha.baidu.com/company_detail_63542105327403. Archived from the original on 28 September 2023. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 (PDF) http://gxt.guizhou.gov.cn/gxdt/tzgg/202112/P020211228784600345170.pdf. {{cite web}}: Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 https://web.archive.org/web/20220318233151/https://m.mysteel.com/21/1012/17/45E9777F60AECE43_abc.html. Archived from the original on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://archive.org/details/screenshot-2022-11-28-at-12.37.36-pm. {{cite web}}: Missing or empty |title= (help)

Resources