Gull Island hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Gull Island hydroelectric plant is a hydroelectric power plant in pre-construction in Labrador, Newfoundland and Labrador, Canada.
Project Details
Table 1: Project details for Gull Island hydroelectric plant
Status | Nameplate capacity | Technology type | Owner |
---|---|---|---|
Pre-construction[1][2] | 2250 MW[2] | Run-of-river[3] | NL Hydro; Hydro Québec[1][1] |
Location
Table 2: Location details for Gull Island hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Labrador, Newfoundland and Labrador, Canada[4] | Churchill River[1] | 52.9646, -61.3728 (exact)[4] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://www.hydroreview.com/hydro-industry-news/new-development/canadian-provinces-reach-multi-billion-dollar-deal-over-power-from-churchill-falls-hydroelectric-plant/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://www.reuters.com/business/energy/eastern-canadian-provinces-agree-replace-contentious-churchill-falls-hydropower-2024-12-12/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.gov.nl.ca/ecc/projects/project-1305/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 (PDF) https://web.archive.org/web/20210119204650/https://muskratfalls.nalcorenergy.com/wp-content/uploads/2013/03/Report-Why-not-develop-Gull-Island-first.pdf. Archived from the original (PDF) on 2021-01-19.
{{cite web}}
: Missing or empty|title=
(help)