Guoxin Dafeng power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Guoxin Dafeng power station (江苏国信大丰港煤电一体化发电项目) is a cancelled power station in Yancheng City, Dafeng, Yancheng, Jiangsu, China. It is also known as Dafeng Port Power Plant Phase I (Unit 1, Unit 2).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Guoxin Dafeng power station | Yancheng City, Dafeng, Yancheng, Jiangsu, China | 33.266, 120.753 (approximate) |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology |
---|---|---|---|---|
Unit 1 | cancelled | coal: unknown | 1000 | supercritical |
Unit 2 | cancelled | coal: unknown | 1000 | supercritical |
Unit 3 | cancelled | coal: unknown | 1000 | supercritical |
Unit 4 | cancelled | coal: unknown | 1000 | supercritical |
Unit 5 | cancelled | coal: unknown | 1000 | supercritical |
Unit 6 | cancelled | coal: unknown | 1000 | supercritical |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Jiangsu Guoxin Dafenggang Power Generation Co Ltd [100%] | Jiangsu Guoxin Investment Group Ltd [100.0%] |
Unit 2 | Jiangsu Guoxin Dafenggang Power Generation Co Ltd [100%] | Jiangsu Guoxin Investment Group Ltd [100.0%] |
Unit 3 | Jiangsu Guoxin Dafenggang Power Generation Co Ltd [100%] | Jiangsu Guoxin Investment Group Ltd [100.0%] |
Unit 4 | Jiangsu Guoxin Dafenggang Power Generation Co Ltd [100%] | Jiangsu Guoxin Investment Group Ltd [100.0%] |
Unit 5 | Jiangsu Guoxin Dafenggang Power Generation Co Ltd [100%] | Jiangsu Guoxin Investment Group Ltd [100.0%] |
Unit 6 | Jiangsu Guoxin Dafenggang Power Generation Co Ltd [100%] | Jiangsu Guoxin Investment Group Ltd [100.0%] |
Background on Project
In 2009 it was reported that China Resources, in an agreement with Dafeng City, would begin construction on two 1,000 MW units in Dafeng in two years, but they had not yet been permitted.[1]
In 2013 it was reported that the Dafeng Port coal and electricity integration project was agreed to and being developed by a joint venture of Shaanxi Coal Chemical Group, Jiangsu Guoxin Group, Jiangsu Yueda Group and Dafeng Port Economic Zone. According to different sources, plans included a 4 x 1,000 MW plant,[2] or a 6 x 1,000 MW plant.[3] Other sources describe a 2 x 1,000 MW plant.[4]
In September 2015, Units 1-2 of 1,000 MW each completed a feasibility study.[5][6][7]
There have been no further developments, and the project appears to be cancelled.
Articles and Resources
References
- ↑ "华润电力80亿在江苏大丰建两台100万千瓦电厂", 新浪财经, 2009-07-08
- ↑ "董启彬董事长出席大丰港煤电一体化项目合作签约仪式 ", 江苏省国信资产管理集团有限公司, 2013-04-09
- ↑ "大丰港煤电一体化项目合作协议签约",中国江苏网, 2013-04-09
- ↑ "江苏国信大丰港电厂项目通过初步可行性研究审查", 江苏省国信资产管理集团有限公司, 2013-09-11
- ↑ "江苏国信大丰港电厂项目通过初步可行性研究审查," Jiangsu Guoxin Investment Group Limited, 2013-09-11
- ↑ "江苏国信集团董事长马秋林来丰," Dafeng.gov, 2015-08-07
- ↑ "董启彬董事长出席大丰港煤电一体化项目合作签约仪式," Jiangsu Guoxin Investment Group Limited, 2013-04-09
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.