H2 Backbone WAG and Penta-West
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
H2 Backbone WAG and Penta-West is a proposed hydrogen pipeline running in Austria, Slovakia and Germany.
Location
The pipeline is proposed to run from Weiden an der March, Slovakia, through Oberkappel, Austria, terminating in Burghausen, Germany.
Project details
- Operator: [1]
- Owner: Gas Connect Austria[1]
- Parent company:
- Capacity: 150GWh/d
- Length:
- WAG: 140km
- Penta-West: 200km
- Diameter:
- Status: Proposed[1]
- Start year: 2030[1]
- Cost:
- Financing:
- Associated infrastructure:
Background
The route from the project is derived from the H2inframap, which displays a collection of hydrogen-related projects across Europe.[1]