Hai-Fu power station (長生電力二期更新改建發電, 長生電廠, 海湖發電廠) is an operating power station of at least 1072-megawatts (MW) in Luzhu District, Taoyuan, Taiwan with multiple units, some of which are not currently operating. It is also known as Changsheng (Units 1, 2), Ever Power (Units 1, 2), Ever Power phase 2 (Unit New 1), Changsheng II (Unit New 1).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Hai-Fu power station Luzhu District, Taoyuan, Taiwan 25.116523, 121.256293 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 1, 2, New 1: 25.116523, 121.256293

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
1 Operating[2][3] fossil gas: LNG[3][4] 536[4][5][6] combined cycle[7] not found 1999[7] 2025 (planned)[8]
2 Operating[2][3] fossil gas: LNG[3][4] 536[4][5][6] combined cycle[7] not found 1999[7] 2026 (planned)[9][10]
New 1 Pre-construction[11] fossil gas: LNG[12][11] 1100[1] combined cycle[1][11] not found 2027 (planned)[1]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 Ever Power IPP Co Ltd [100%][1] Singapore Power International Pte Ltd
2 Ever Power IPP Co Ltd [100%][1] Singapore Power International Pte Ltd
New 1 Ever Power IPP Co Ltd [100%][1] Singapore Power International Pte Ltd

Background

Unit 1 and Unit 2 officially commenced operations in 1999. [13]Unit New 1 is currently in the environmental assessment approval stage, with an expected commissioning date in 2027. Unit 1 and Unit 2 are scheduled for retirement in 2025 and 2026, respectively. Unit New 1 will take over the operations replacing Unit 1 and Unit 2. [14]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "燃氣商機催動民營電廠 北中南新增容量逾半座中火 污染還需環評把關". 環境資訊中心. 2022-03-16. Archived from the original on 2022-11-17. Retrieved 2024-06-03.
  2. 2.0 2.1 https://web.archive.org/web/20221117035638/https://www.taipower.com.tw/en/news_noclassify_info.aspx?id=4368&chk=0b4b52a9-eca9-4434-a8a2-00155d48dd0f&mid=5525&param=pn%3D1%26mid%3D5525%26key%3D. Archived from the original on 2022-11-17. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20221203095506/https://www.alstom.com/press-releases-news/2011/3/Alstom-signs-an-extension-of-an-Operation-and-Maintenance-contract-worth-just-under-euro-300-million-for-Hai-Fu-gas-fired-combined-cycle-power-plant-in-Taiwan. Archived from the original on 2022-12-03. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 http://www.everpoweripp.com.tw/annual/110.html. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 http://www.everpoweripp.com.tw/annual/111.html. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20240118083428/https://apan1121.github.io/powerInfoV2/. Archived from the original on 2024-01-18. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 https://web.archive.org/web/20221203095505/https://new.abb.com/news/detail/13453/abb-wins-us-660-million-combined-cycle-power-plant-order-in-taiwan. Archived from the original on 2022-12-03. {{cite web}}: Missing or empty |title= (help)
  8. https://eiadoc.epa.gov.tw/EIAforum/30_View.aspx?para=41D98611606F35A364093EAA1CC08FC7A164D584EECCB30BC064BF365D20602C https://money.udn.com/money/story/7307/7080421 https://eiadoc.epa.gov.tw/EIAforum/30_View.aspx?para=41D98611606F35A364093EAA1CC08FC7A164D584EECCB30BC064BF365D20602C. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  9. https://web.archive.org/web/20230511012355/https://money.udn.com/money/story/7307/7080421. Archived from the original on 2023-05-11. {{cite web}}: Missing or empty |title= (help)
  10. https://eiadoc.epa.gov.tw/EIAforum/30_View.aspx?para=41D98611606F35A364093EAA1CC08FC7A164D584EECCB30BC064BF365D20602C. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 "公告「長生電力二期更新改建發電計畫環境影響說明書」審查結論" (PDF). 2024-05-17. Archived from the original (PDF) on 2024-06-03. Retrieved 2024-06-03.
  12. https://www.ctee.com.tw/news/20231005701645-430104. {{cite web}}: Missing or empty |title= (help)
  13. "ABB wins US$ 660-million combined-cycle power plant order in Taiwan". 1998-01-20. Retrieved 2023-12-04.{{cite web}}: CS1 maint: url-status (link)
  14. "桃園海湖電廠汰舊換新環評再審 加強海域水質監測". 2023-04-06. Retrieved 2023-12-04.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.