Hallösa wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Hallösa wind farm is a wind farm in pre-construction in Jönköping, Sweden.

Project Details

Table 1: Phase-level project details for Hallösa wind farm

Status Commissioning year Nameplate capacity Type Owner
Pre-construction[1] 2024 (planned)[2] 59 MW[2][1] Onshore[1] Prime Capital AG [100%][2][1]

Location

Table 2: Phase-level location details for Hallösa wind farm

Location Coordinates (WGS 84)
Jönköping, Jönköping, Sweden[2][3] 57.7576, 14.1734 (approximate)[2][3]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240126054601/https://renews.biz/79495/prime-capital-buys-70mw-swedish-wind-project/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 (PDF) https://web.archive.org/web/20240409044016/https://swedishwindenergy.com/wp-content/uploads/2024/02/Statistics-and-forecast-Q4-2023-1.pdf. Archived from the original (PDF) on 09 April 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 (PDF) https://web.archive.org/web/20240201024616/https://www.lansstyrelsen.se/download/18.4a4eb7416faedec125791b/1579691328604/Kung%C3%B6relse%20ans%C3%B6kan%20Hall%C3%B6sa%20Vindkraft%20AB.pdf. Archived from the original (PDF) on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)