Hamada al Hamra-Zawiya Oil Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Hamada al Hamra-Zawiya Oil Pipeline, خط أنابيب الحمادة الحمراء - الزاوية is an operating oil pipeline, running from Hamada al Hamra oilfield, west libya, 420km south Tripoli, to Zawiya terminal, 40km west Tripoli, Libya.[1]

Location

The pipeline runs/would run from Hamada al Hamra oilfield, Jabal al-Gharbi district, to Zawiya terminal, Zawiya district, Libya.[1][2]

Loading map...

Background

Project. details

  • Operator: Arabian Gulf Oil Company (AGOCO)[3][4]
  • Owner: Libyan National Oil Corporation (NOC)[4][3]
  • Parent Company: Libyan National Oil Corporation (NOC)[3] [4]
  • Capacity: 800000 bpd[5]
  • Length: 386km / 239.94mi[6]
  • Diameter: 18 inches[6]
  • Status: Operating
  • Start Year:
  • Cost:
  • Financing:
  • Associated infrastructure:

Articles and resources

References

  1. 1.0 1.1 ""الهلال النفطي" ليس وحده من يحتكر قطاع الطاقة في ليبيا". القدس العربي (in العربية). 2020-06-24. Retrieved 2022-03-02.
  2. Gupte, Eklavya (2021-12-20). "Libya's Sharara, Hamada oil fields and Zawiya terminal shut due to PFG blockade". www.spglobal.com. Retrieved 2022-03-02.
  3. 3.0 3.1 3.2 "About". www.agoco.ly. Retrieved 2022-03-02.
  4. 4.0 4.1 4.2 "Who owns Libya's oil?". United World International. 2020-06-17. Retrieved 2022-03-02.
  5. "مؤسسة النفط الليبية تعلن حالة القوة القاهرة في حقل نفطي أغلق محتجون من حراس النفط صمامه".{{cite web}}: CS1 maint: url-status (link)
  6. 6.0 6.1 "ASB2013. OPEC. P. 72" (PDF).{{cite web}}: CS1 maint: url-status (link)

Related GEM.wiki articles

External resources

External articles