Hardin Solar Energy

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Hardin Solar Energy is an operating solar photovoltaic (PV) farm in Alger, Hardin County, Ohio, United States.

Project Details

Table 1: Phase-level project details for Hardin Solar Energy

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Operating[1] 2021[2] 150 MWac[3] PV[3] Dominion Energy Inc [100%][1] Invenergy[3]
2 Operating[4] 2025[5] 150 MW[6] PV[3] Invenergy LLC [100%][7] Invenergy[3]
3 Construction[8] 2025 (planned)[9] 250 MW[10] PV[11] Invenergy LLC [100%][11]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Hardin Solar Energy

Phase Name Location Coordinates (WGS 84)
1 Alger, Hardin County, Ohio, United States[3] 40.6595, -83.8137 (exact)[3]
2 Belle Center, Hardin County, Ohio, United States[3] 40.6325, -83.7924 (exact)[3]
3 Hardin County, Ohio, United States[12] 40.6278, -83.8279 (approximate)[12]

The map below shows the locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20210330040702/https://www.renewableenergyworld.com/solar/150-mw-hardin-solar-generating-facility-acquired-by-dominion-energy/. Archived from the original on 30 March 2021. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20211027002254/https://www.limaohio.com/news/482382/hardin-county-solar-energy-center-dedicated. Archived from the original on 27 October 2021. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
  4. https://www.eia.gov/electricity/data/eia860m/ https://renewablesnow.com/news/invenergys-150-mw-hardin-ii-solar-plant-starts-operations-in-ohio-1268984/, https://www.eia.gov/electricity/data/eia860m/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  5. https://hardinsolar.invenergy.com/ https://renewablesnow.com/news/invenergys-150-mw-hardin-ii-solar-plant-starts-operations-in-ohio-1268984/, https://hardinsolar.invenergy.com/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  6. https://web.archive.org/web/20240201184841/https://hardinsolar.invenergy.com/. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20240206200840/https://www.power-technology.com/marketdata/hardin-solar-2-pv-park-battery-energy-storage-system-us/. Archived from the original on 2024-02-06. {{cite web}}: Missing or empty |title= (help)
  8. https://renewablesnow.com/news/invenergys-150-mw-hardin-ii-solar-plant-starts-operations-in-ohio-1268984/ https://myfox28columbus.com/news/building-ohios-future-intel-beyond/pataskala-solar-panel-manufacturer-ships-first-panels-to-hardin-county, https://renewablesnow.com/news/invenergys-150-mw-hardin-ii-solar-plant-starts-operations-in-ohio-1268984/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  9. https://renewablesnow.com/news/invenergys-150-mw-hardin-ii-solar-plant-starts-operations-in-ohio-1268984/ https://hardinsolariii.invenergy.com/about-project, https://renewablesnow.com/news/invenergys-150-mw-hardin-ii-solar-plant-starts-operations-in-ohio-1268984/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  10. https://web.archive.org/web/20240201185023/https://hardinsolariii.invenergy.com/. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 https://web.archive.org/web/20240201190809/https://pv-magazine-usa.com/2021/09/17/ohio-approves-more-than-530-mw-of-solar-additions/. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 https://web.archive.org/web/20240125175111/https://invenergy.com/projects/our-projects. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)