Heard County Pumped hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Heard County Pumped hydroelectric plant is an announced hydroelectric power plant in Georgia, United States.
Project Details
Table 1: Project details for Heard County Pumped hydroelectric plant
Status | Nameplate capacity | Turbines | Technology type | Owner |
---|---|---|---|---|
Announced[1] | 1000 MW[2] | 3[2] | Pumped storage[1] | Nelson Energy LLC[3] |
Location
Table 2: Location details for Heard County Pumped hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Georgia, United States[2] | Hilly Mill Creek[3] | 33.3607, -85.0141 (approximate)[2] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://www.ferc.gov/sites/default/files/2024-12/ActivePrelimPermits_12.10.2024.xlsx.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 https://www.federalregister.gov/documents/2023/04/07/2023-07391/heard-county-pumped-storage-project-notice-of-preliminary-permit-application-accepted-for-filing-and.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 (PDF) https://web.archive.org/web/20240716205013/https://chattahoochee.org/wp-content/uploads/2023/10/Heard-County-Fact-Sheet-October-2023.pdf. Archived from the original (PDF) on 2024-07-16.
{{cite web}}
: Missing or empty|title=
(help)