Hebei Chengde Pingquan (Longyuan) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Hebei Chengde Pingquan (Longyuan) Forestry Photovoltaic Hydrogen Storage Integration Project

Hebei Chengde Pingquan (Longyuan) solar farm is a solar photovoltaic (PV) farm in pre-construction in Yangshuling Town, Pingquan City, Chengde, Hebei, China.

Project Details

Table 1: Phase-level project details for Hebei Chengde Pingquan (Longyuan) solar farm

Status Commissioning year Nameplate capacity Technology Owner Operator
Pre-construction[1] 2024 (planned)[2] 100 MWac[3] PV[3] Hebei Longyuan Wind Power Generation CO LTD [100%] (河北龙源风力发电有限公司)[4] Pingquan Longyuan New Energy CO LTD (平泉龙源新能源有限公司)[3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Hebei Chengde Pingquan (Longyuan) solar farm

Location Coordinates (WGS 84)
Yangshuling Town, Pingquan City, Chengde, Hebei, China[1] 40.9971, 118.8846 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20240207155558/https://www.pingquan.gov.cn/art/2022/5/30/art_6179_855533.html. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://web.archive.org/web/20240507002737/https://m.bjx.com.cn/mnews/20240207/1360734.shtml. Archived from the original on 07 May 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20240207021630/https://news.bjx.com.cn/html/20220909/1254146-2.shtml. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. https://web.archive.org/web/20220916160427/https://www.qcc.com/weblogin?back=%2Ffirm%2Ff835db55906f2d39b89e32730cdfe82d.html. Archived from the original on 16 September 2022. {{cite web}}: Missing or empty |title= (help)