Henan Jiyuan Iron & Steel (Group) Co., Ltd. Gas Power Project
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Henan Jiyuan Iron & Steel (Group) Co., Ltd. Gas Power Project (河南济源钢铁(集团)有限公司2#80MW高温超高压煤气发电节能改造工程 (Unit 2), 河南济源钢铁(集团)有限公司80MW高温超高压煤气发电工程 (Unit 1)) is an operating power station of at least 160-megawatts (MW) in Jiyuan, Henan, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Henan Jiyuan Iron & Steel (Group) Co., Ltd. Gas Power Project | Jiyuan, Jiyuan, Henan, China | 35.084091, 112.551053 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1, 2: 35.084091, 112.551053
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Operating[1] | industrial by-product: blast furnace gas[1] | 80[1] | steam turbine[1] | not found | 2018[1] |
2 | Operating[2] | industrial by-product: blast furnace gas[3] | 80[3] | steam turbine[3] | not found | 2021[4] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Henan Jiyuan Iron & Steel (Group) Co Ltd [100%][1][3] | Henan Jiyuan Iron and Steel Investment Holding Co Ltd [48.6%]; unknown [35.0%]; Tianjin Jinyuan Guotai Enterprise Management Consulting Co Ltd [10.0%]; Trade Union Committee of Henan Jiyuan Iron and Steel (Group) [6.4%] |
2 | Henan Jiyuan Iron & Steel (Group) Co Ltd [100%][1][3] | Henan Jiyuan Iron and Steel Investment Holding Co Ltd [48.6%]; unknown [35.0%]; Tianjin Jinyuan Guotai Enterprise Management Consulting Co Ltd [10.0%]; Trade Union Committee of Henan Jiyuan Iron and Steel (Group) [6.4%] |
Project-level captive use details
Background
Unit 1 commenced construction on August 21, 2017, and was officially put into operation on May 23, 2018.[5]
Unit 2 started construction on March 29, 2019,[6] and according to a report by Pengpai News in August 2021, the project is now in operation.[7]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 https://web.archive.org/web/20211130145508/http://hnjg.com/?xinwen/360.html. Archived from the original on 2021-11-30.
{{cite web}}
: Missing or empty|title=
(help) - ↑ , http://www.mcc.com.cn/mcc/_132154/_132572/581714/index.html https://m.thepaper.cn/newsDetail_forward_14208665 , http://www.mcc.com.cn/mcc/_132154/_132572/581714/index.html.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 https://hbj.jiyuan.gov.cn/14196/17078/17081/17106/t565296.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://m.thepaper.cn/newsDetail_forward_14208665.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "集团公司80MW高温超高压煤气发电工程竣工投产". 2018-05-25. Retrieved 2023-11-10.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "中冶京诚河南济源钢铁2号80兆瓦高温超高压煤气发电节能工程开工". 2019-04-01. Retrieved 2023-11-10.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "节能减碳•中冶行动丨"冶金建设国家队"以绿色实践书写"双碳"答卷". 2021-08-25. Retrieved 2023-11-09.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.