Henan Xinzhongyi power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Henan Xinzhongyi power station (河南投资集团中益发电厂) is an operating power station of at least 1320-megawatts (MW) in Fengquan, Xinxiang, Henan, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Henan Xinzhongyi power station | Fengquan, Xinxiang, Henan, China | 35.2445824, 113.8510899 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2, Unit 3, Unit 4: 35.2445824, 113.8510899
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year |
---|---|---|---|---|---|---|
Unit 1 | retired | coal: unknown | 220 | subcritical | 1989 | 2008 |
Unit 2 | retired | coal: unknown | 220 | subcritical | 1990 | 2008 |
Unit 3 | operating | coal: unknown | 660 | ultra-supercritical | 2015 | – |
Unit 4 | operating | coal: unknown | 660 | ultra-supercritical | 2015 | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Xinxiang Zhongyi Power Generation Co Ltd [100%] | Henan Yuneng Holdings Co Ltd [100.0%] |
Unit 2 | Xinxiang Zhongyi Power Generation Co Ltd [100%] | Henan Yuneng Holdings Co Ltd [100.0%] |
Unit 3 | Xinxiang Zhongyi Power Generation Co Ltd [100%] | Henan Yuneng Holdings Co Ltd [100.0%] |
Unit 4 | Xinxiang Zhongyi Power Generation Co Ltd [100%] | Henan Yuneng Holdings Co Ltd [100.0%] |
Background
Two units of the power station, totaling 440 MW, were retired in 2008. They are also referred to as units 5-6 of the Xinxiang Huayu power station, bought by Henan Investment Group from China Power Investment.[1][2]
In 2013 Henan Investment Group began construction on two supercritical units of 600 MW each at the power station. The new units replaced two older units,[3][4] also referred to as units 5-6 of the Xinxiang Huayu power station, although they were owned by Henan Investment Group.
The new units were constructed at 660 MW each. They began trial runs in December 2014, and were reported as operating in 2015.[5]
Articles and Resources
References
- ↑ "河南新中益电力有限公司简介", 河南新中益电力有限公司网站
- ↑ "国家能源局同意河南新乡新中益上大压小扩建工程开展前期工作", 中国电机工程学会热电专业委员会门户网站, 2012-3-22
- ↑ "新乡市长垣县举行2×600兆瓦机组工程奠基仪式", 网易新闻, 2012-02-27
- ↑ "河南电建一公司新乡中益工程2号机组安装开工", 中国电力建设集团新闻信息, 2013-09-30
- ↑ "河南省环保厅拟批复河南新乡新中益“上大压小”扩建项目先期验收申请," 北极星电力网, 2015/4/28