High Lonesome wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
High Lonesome wind farm is an operating wind farm in Crockett County, Texas, United States.
Project Details
Table 1: Phase-level project details for High Lonesome wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2021[2] | 450 MW[2] | Onshore[2] | Enel Green Power SpA [100%][1] | Enel Green Power[1] |
2 | Operating[1] | 2021[2] | 51 MW[2] | Onshore[2] | Enel Green Power SpA [100%][1] | Enel Green Power[1] |
Location
Table 2: Phase-level location details for High Lonesome wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Crockett County, Texas, United States[2] | 31.0612, -101.8980 (exact)[2] |
2 | Upton County, Texas, United States[2] | 31.1081, -101.9160 (exact)[2] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240126123211/https://www.enelgreenpower.com/our-projects/highlights/high-lonesome-wind-farm. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (2018-04-19). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on 2021-12-03. Retrieved 2021-04-09.
{{cite web}}
: CS1 maint: multiple names: authors list (link)