Himchuli Dordi hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Himchuli Dordi hydroelectric plant is a hydroelectric power plant under construction in Dordi Rural Municipality, Lamjung District, Gandaki Zone, Gandaki Province, Nepal.

Project Details

Table 1: Project details for Himchuli Dordi hydroelectric plant

Status Commissioning year Nameplate capacity Technology type Owner
Construction[1] 2025[2] 57 MW[1] Run-of-river[3] Peoples Hydropower Company Private LTD (PHCL) [100%][3]

Location

Table 2: Location details for Himchuli Dordi hydroelectric plant

Location River Coordinates (WGS 84)
Dordi Rural Municipality, Lamjung District, Gandaki Zone, Gandaki Province, Nepal[4] Dordi River[3] 28.3274, 84.5792 (approximate)[4]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20220813023309/https://www.investopaper.com/news/peoples-hydropower-to-construct-himchuli-dordi-hydropower-project-57-mw/. Archived from the original on 2022-08-13. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20220817165212/https://www.power-technology.com/marketdata/himchuli-dordi-nepal/. Archived from the original on 2022-08-17. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://peopleshydro.com.np/?page_id=619. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20221206083000/https://hydro.naxa.com.np/core/datasets/. Archived from the original on 2022-12-06. {{cite web}}: Missing or empty |title= (help)