Hiyama Area Offshore wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Hiyama Area Offshore Project
Hiyama Area Offshore wind farm (檜山エリア洋上風力発電事業 Hiyama area OWF, 檜山エリア洋上風力発電事業) is an announced wind farm in Yakumo, Futami, Hokkadio Prefecture, Japan.
Project Details
Table 1: Phase-level project details for Hiyama Area Offshore wind farm
Status | Nameplate capacity | Type | Owner |
---|---|---|---|
Announced[1] | 722 MW[2] | Offshore mount unknown[2] | Electric Power Development CO LTD (J-POWER) [100%] (電源開発株式会社)[3] |
Location
Table 2: Phase-level location details for Hiyama Area Offshore wind farm
Location | Coordinates (WGS 84) |
---|---|
Yakumo, Futami, Hokkadio Prefecture, Japan[3] | 41.7427, 140.0182 (approximate)[3] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20240126124720/https://cosmo.eco-power.co.jp/news/224.php. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20240125184424/https://www.meti.go.jp/policy/safety_security/industrial_safety/sangyo/electric/detail/furyoku_hinokiyama_DK.html. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 https://web.archive.org/web/20240131105712/https://www.pref.hokkaido.lg.jp/ks/ksk/assesshp/project_hou56_hiyama_huuryoku_.html. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help)