Table 1: Unit-level project details for Hongyanhe nuclear power plant

Unit name Status Commissioning year Nameplate capacity Reactor type Model Owner Operator
1-1 Operating[1] 2013[2] 1119 MW[2] Pressurized water reactor[3] CPR-1000[2] CGNPC Nuclear Power Investment CO LTD [100%] (中广核核电投资有限公司)[4] Liaoning Hongyanhe Nuclear Power CO LTD (辽宁红沿河核电有限公司)[3]
1-2 Operating[1] 2014[5] 1119 MW[5] Pressurized water reactor[3] CPR-1000[5] CGNPC Nuclear Power Investment CO LTD [100%] (中广核核电投资有限公司)[4] Liaoning Hongyanhe Nuclear Power CO LTD (辽宁红沿河核电有限公司)[3]
1-3 Operating[1] 2015[6] 1119 MW[6] Pressurized water reactor[3] CPR-1000[6] CGNPC Nuclear Power Investment CO LTD [100%] (中广核核电投资有限公司)[4] Liaoning Hongyanhe Nuclear Power CO LTD (辽宁红沿河核电有限公司)[3]
1-4 Operating[1] 2016[1] 1119 MW[7] Pressurized water reactor[3] CPR-1000[7] CGNPC Nuclear Power Investment CO LTD [100%] (中广核核电投资有限公司)[4] Liaoning Hongyanhe Nuclear Power CO LTD (辽宁红沿河核电有限公司)[3]
2-5 Operating[1] 2021[8] 1119 MW[8] Pressurized water reactor[3] ACPR-1000[8] CGNPC Nuclear Power Investment CO LTD [100%] (中广核核电投资有限公司)[4] Liaoning Hongyanhe Nuclear Power CO LTD (辽宁红沿河核电有限公司)[3]
2-6 Operating[1] 2022[1] 1119 MW[9] Pressurized water reactor[3] ACPR-1000[9] CGNPC Nuclear Power Investment CO LTD [100%] (中广核核电投资有限公司)[4] Liaoning Hongyanhe Nuclear Power CO LTD (辽宁红沿河核电有限公司)[3]

Table 2: Additional unit-level timeline details for Hongyanhe nuclear power plant

Unit name Construction start First criticality (more info) First grid connection Commercial operation
1-1 August 18, 2007[2] January 16, 2013[2] February 17, 2013[2] June 6, 2013[2]
1-2 March 28, 2008[5] October 24, 2013[5] November 23, 2013[5] May 13, 2014[5]
1-3 March 7, 2009[6] October 27, 2014[6] March 23, 2015[6] August 16, 2015[6]
1-4 August 15, 2009[7] March 5, 2016[7] April 1, 2016[7] June 8, 2016[1]
2-5 March 29, 2015[8] June 13, 2021[8] June 25, 2021[8] July 31, 2021[8]
2-6 July 24, 2015[9] April 21, 2022[9] May 2, 2022[9] June 23, 2022[1]

Table 3: Additional unit-level capacity details for Hongyanhe nuclear power plant

(Read more about nuclear capacity definitions.)

Unit name Reference net capacity Design net capacity Thermal capacity
1-1 1061 MW[2] 1061 MW[2] 2905 MWt[2]
1-2 1061 MW[5] 1061 MW[5] 2905 MWt[5]
1-3 1061 MW[6] 1061 MW[6] 2905 MWt[6]
1-4 1061 MW[7] 1061 MW[7] 2905 MWt[7]
2-5 1061 MW[8] 1061 MW[8] 2905 MWt[8]
2-6 1061 MW[9] 1061 MW[9] 2905 MWt[9]

Location

Table 4: Unit-level location details for Hongyanhe nuclear power plant

Unit name Location Coordinates (WGS 84)
1-1 Hongyanhe, Wafangdian City, Dalian, Liaoning, China[3] 39.7964, 121.4774 (exact)
1-2 Hongyanhe, Wafangdian City, Dalian, Liaoning, China[3] 39.7964, 121.4774 (exact)
1-3 Hongyanhe, Wafangdian City, Dalian, Liaoning, China[3] 39.7964, 121.4774 (exact)
1-4 Hongyanhe, Wafangdian City, Dalian, Liaoning, China[3] 39.7964, 121.4774 (exact)
2-5 Hongyanhe, Wafangdian City, Dalian, Liaoning, China[3] 39.7964, 121.4774 (exact)
2-6 Hongyanhe, Wafangdian City, Dalian, Liaoning, China[3] 39.7964, 121.4774 (exact)

The map below shows the exact location of the nuclear power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Nuclear Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 https://web.archive.org/web/20220624053816/http://www.gov.cn/xinwen/2022-06/24/content_5697422.htm. Archived from the original on 24 June 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 https://web.archive.org/web/20221126222305/https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=904. Archived from the original on 26 November 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 https://web.archive.org/web/20220706202028/http://heneng.net.cn/home/zc/infohdz/id/12/catId/165.html. Archived from the original on 06 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 https://www.qcc.com/firm/43235d53cd9f90ae7085fb99f7f85fc2.html. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 https://web.archive.org/web/20220526040636/https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=905. Archived from the original on 26 May 2022. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 https://web.archive.org/web/20220526011955/https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=906. Archived from the original on 26 May 2022. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 https://web.archive.org/web/20221126222255/https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=907. Archived from the original on 26 November 2022. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 8.8 8.9 https://web.archive.org/web/20220726191531/https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=997. Archived from the original on 26 July 2022. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 https://web.archive.org/web/20220912053734/https://pris.iaea.org/pris/CountryStatistics/ReactorDetails.aspx?current=998. Archived from the original on 12 September 2022. {{cite web}}: Missing or empty |title= (help)