Horia solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Horia solar farm is a solar photovoltaic (PV) farm under construction in Arad, Romania.
Project Details
Table 1: Phase-level project details for Horia solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Construction[1][2] | 2024 (planned)[3] | 40 MW[3] | PV[3] | Clean Capital Energy (CCE) [100%][3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Horia solar farm
Location | Coordinates (WGS 84) |
---|---|
Arad, Romania[3] | 46.2097, 21.4598 (approximate)[3] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20240515182949/https://www.cce-holding.com/en/energy-transition-in-romania-cce-receives-permits-for-4-more-pv-projects-with-over-230-mwp/. Archived from the original on 15 May 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240218232412/https://balkangreenenergynews.com/start-of-construction-underway-for-three-big-solar-parks-in-romania/. Archived from the original on 18 February 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 https://web.archive.org/web/20240201215733/https://list.solar/news/cce-gets-building/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)