Huadian Chongqing Tongnan power station (华电重庆潼南燃机热电联产项目一期(Unit 1-1 and 1-2), 潼南天然气发电项目) is a power station in Tongnan High-Tech Zone, Tongnan District, Chongqing, China with multiple units of varying statuses, none of which are currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Huadian Chongqing Tongnan power station Tongnan High-Tech Zone, Tongnan District, Chongqing, China 30.195494, 105.845289 (approximate)[1][2]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1-1 Construction[1][3] fossil gas: natural gas[4][5] 500[6] combined cycle[6] yes[6][7] 2025 (planned)[2][2]
1-2 Construction[1][3] fossil gas: natural gas[5] 500[6][2] combined cycle[6] yes[6][7] 2026 (planned)[2]
2-1 Announced[4] fossil gas: natural gas[4] 500[4] combined cycle[4] not found
2-2 Announced[4] fossil gas: natural gas[4] 500[4] gas turbine[4] not found

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1-1 China Huadian Group Co Ltd Chongqing Branch [100%][8][9] China Huadian Corp Ltd [100.0%]
1-2 China Huadian Group Co Ltd Chongqing Branch [100%][8][9] China Huadian Corp Ltd [100.0%]
2-1 China Huadian Group Co Ltd Chongqing Branch [100%][8][9] China Huadian Corp Ltd [100.0%]
2-2 China Huadian Group Co Ltd Chongqing Branch [100%][8][9] China Huadian Corp Ltd [100.0%]

Background

In February 2023, the Chongqing Municipal Development and Reform Commission approved this project. [10]The project is currently in the process of finalizing preliminary preparations, with an expected completion and start of production by December 2024.[11]

Articles and Resources

References

  1. 1.0 1.1 1.2 https://www.sohu.com/a/788631919_120578424. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240409052726/https://m.bjx.com.cn/mnews/20240123/1357558.shtml. Archived from the original on 2024-04-09. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 "重庆华电潼南一期2×500MW级气电工程正式动工-北极星电力新闻网". m.bjx.com.cn. 2024-06-27. Archived from the original on 2024-07-03. Retrieved 2024-07-01.
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 "第五届西洽会全市重点项目集中签约 两个重大项目落户潼南". www.cqtn.gov.cn. 2023-05-20. Archived from the original on 2024-05-22. Retrieved 2024-05-21.
  5. 5.0 5.1 https://web.archive.org/web/20220708185342/https://news.bjx.com.cn/html/20210810/1169079.shtml. Archived from the original on 2022-07-08. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 http://www.cqtn.gov.cn/bm/qfzggw/zwxx_25190/bmdt/202302/t20230220_11626142.html. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 "重庆市潼南区天然气发电项目获批-国际燃气网". gas.in-en.com. 2023-02-17. Archived from the original on 2024-05-22. Retrieved 2024-05-21.
  8. 8.0 8.1 8.2 8.3 https://m.bjx.com.cn/mnews/20240702/1386526.shtml. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 https://fzggw.cq.gov.cn/zwgk/zfxxgkml/sphzbaxx/202407/t20240702_13340136_wap.html. {{cite web}}: Missing or empty |title= (help)
  10. "市发改委核准批复重庆华电潼南一期2x500MW级气电工程". 2023-02-20. Retrieved 2023-10-16.{{cite web}}: CS1 maint: url-status (link)
  11. "华电集团新增2×500MW级气电工程项目". 2023-05-09. Retrieved 2023-10-16.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.