Huadian Shunde Longjiang Distributed Gas power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Huadian Shunde Longjiang Distributed Gas power station (华电顺德龙江燃气分布式能源站(一期) (Unit 1-2), 华电顺德龙江燃气分布式能源站(二期) (Unit 2-1), 华电顺德龙江燃气分布式能源站(一期) (Unit 1-1)) is a power station in Foshan, Shunde, Shunde District, Guangdong, China with multiple units of varying statuses none of which are currently operating. It is also known as 华电顺德龙江燃气分布式能源项目.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Huadian Shunde Longjiang Distributed Gas power station Foshan, Shunde, Shunde District, Guangdong, China 22.870053, 113.009387 (exact)[1][2]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 2-1: 22.870053, 113.009387
  • Unit 1-1, Unit 1-2, Unit 2-1: 22.8680093, 113.0118527

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 1-1 pre-permit[3][4][5][6] fossil gas - natural gas[1][7] 76[1][7] combined cycle[3][7] 2024[8]
Unit 1-2 pre-permit[3][4][5][6] fossil gas - natural gas[1][7] 76[1][7] combined cycle[3][7] 2024[8]
Unit 2-1 pre-permit[9] fossil gas - natural gas[10] 500[10] combined cycle[10]
Unit 2-1 shelved - inferred 2 y[1] fossil gas - natural gas[1] 76[1] combined cycle[1]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1-1 Huadian International Power Co Ltd Guangdong Branch [100.0%]
Unit 1-2 Huadian International Power Co Ltd Guangdong Branch [100.0%]
Unit 2-1 Huadian International Power Co Ltd Guangdong Branch [100.0%]
Unit 2-1 Huadian International Power Co Ltd Guangdong Branch [100.0%]

Background

The Phase I of the project received approval from the Foshan Municipal Development and Reform Commission in July 2019. [11]It was originally scheduled to commence construction in August 2019 and to begin operations in December 2020.[12] In June 2021, the Foshan Municipal Development and Reform Commission approved the project's request for an extension to start construction.[13] In February 2023, the Foshan Municipal Energy Development "14th Five-Year Plan" proposed the promotion of this project. This project is scheduled to start operation in 2024.[14]

The Phase II project obtained approval from the Foshan Municipal Development and Reform Commission on September 8, 2021. [15]On July 1, 2023, the Foshan Municipal Development and Reform Commission once again approved the extension request for this project, extending the validity period until September 7, 2024.[16]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://web.archive.org/web/20220407170158/http://www.guangzhoulanyu.com/shownews.asp?id=248. Archived from the original on 07 April 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://web.archive.org/web/20210604003225/http://www.360doc.cn/article/3852985_352390827.html. Archived from the original on 04 June 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20210604165213/http://drc.gd.gov.cn/xmgg/content/mpost_2892874.html. Archived from the original on 04 June 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20211101193322/http://www.foshan.gov.cn/zwgk/zdly/zdjs/content/post_4855712.html. Archived from the original on 01 November 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20220407170034/https://gas.in-en.com/html/gas-3576966.shtml. Archived from the original on 07 April 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20240506201753/http://drc.gd.gov.cn/xmgg/content/post_2892874.html. Archived from the original on 06 May 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 7.5 "华电顺德龙江燃气分布式能源项目核准前公示". 2019-07-15. Retrieved 2024-04-17.
  8. 8.0 8.1 (PDF) https://web.archive.org/web/20220806112529/http://drc.gd.gov.cn/attachment/0/416/416781/3253184.pdf. Archived from the original (PDF) on 06 August 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  9. , http://www.sc168.com/mobile/content.jsp?uuid=6070000528419 http://www.foshan.gov.cn/zwgk/zdly/zdjs/content/post_5706489.html , http://www.sc168.com/mobile/content.jsp?uuid=6070000528419. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  10. 10.0 10.1 10.2 http://fsdr.foshan.gov.cn/gkmlpt/content/4/4975/post_4975435.html?jump=true. {{cite web}}: Missing or empty |title= (help)
  11. "华电顺德龙江燃气分布式能源项目核准前公示". 2019-07-15. Retrieved 2023-10-30.{{cite web}}: CS1 maint: url-status (link)
  12. "华电顺德龙江燃气分布式能源项目社会稳定风险评估信息公示". 2018-09-17. Retrieved 2023-10-30.{{cite web}}: CS1 maint: url-status (link)
  13. "佛山市发展和改革局关于华电顺德龙江燃气分布式能源项目核准延期的公示". 2021-06-04. Retrieved 2023-10-30.{{cite web}}: CS1 maint: url-status (link)
  14. "佛山市能源发展"十四五"规划". 2023-02-13. Retrieved 2023-10-30.{{cite web}}: CS1 maint: url-status (link)
  15. "华电顺德西部生态产业园分布式能源站二期项目核准后公示". 2021-09-08. Retrieved 2023-10-30.{{cite web}}: CS1 maint: url-status (link)
  16. "华电顺德西部生态产业园分布式能源站二期项目核准延期". 2023-07-13. Retrieved 2023-10-30.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.