Huadian Tengger power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Huadian Tengger power station (内蒙古华电腾格里煤电厂) is a power station in the pre-permit stage in Alxa Left Banner, Alxa, Inner Mongolia, China. It is also known as 内蒙古华电腾格里外送基地项目.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Huadian Tengger power station | Alxa Left Banner, Alxa, Inner Mongolia, China | 40.642098, 106.265457 (approximate) |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 1 | pre-permit | coal: unknown | 1000 | ultra-supercritical | 2025 (planned) |
Unit 2 | pre-permit | coal: unknown | 1000 | ultra-supercritical | 2026 (planned) |
Unit 3 | pre-permit | coal: unknown | 1000 | ultra-supercritical | 2026 (planned) |
Unit 4 | pre-permit | coal: unknown | 1000 | ultra-supercritical | 2026 (planned) |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Huadian (Inner Mongolia) New Energy Co Ltd [100%] | China Huadian Group Corp [52.4%]; Huadian Power International Co Ltd [31.0%]; other [16.6%] |
Unit 2 | Huadian (Inner Mongolia) New Energy Co Ltd [100%] | China Huadian Group Corp [52.4%]; Huadian Power International Co Ltd [31.0%]; other [16.6%] |
Unit 3 | Huadian (Inner Mongolia) New Energy Co Ltd [100%] | China Huadian Group Corp [52.4%]; Huadian Power International Co Ltd [31.0%]; other [16.6%] |
Unit 4 | Huadian (Inner Mongolia) New Energy Co Ltd [100%] | China Huadian Group Corp [52.4%]; Huadian Power International Co Ltd [31.0%]; other [16.6%] |
Background
Huadian Tengger 4×1000MW coal power project will be used as a peak-shaving power supply for the Tengger Desert Clean Energy Base to support its electricity exports.[1]
The feasibility study was passed in March 2023.[2] Boiler, steam turbine, and generator procurement bidding was called in May 2023.[3]
In July 2023, Harbin Electric Machinery Co., Ltd. won a bid for plant's turbine generators and ancillary equipment.[4]
Articles and Resources
References
- ↑ "内蒙古4×100万千瓦火力发电项目签约". 北极星电力网. 2023-02-07.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 阿拉善左旗发展和改革委员会 (2023-03-21). "华电腾格里4×1000MW煤电项目初可研评审". 北极星火力发电网.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "内蒙古华电腾格里4×1000MW超超临界燃煤机组工程锅炉、汽轮机发电机采购招标". 北极星电力网. 2023-05-16.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 4台1000兆瓦 ! 哈电电机中标内蒙古华电腾格里汽轮发电机, BJX, 2023-07-11