Huadian Tengger power station (内蒙古华电腾格里煤电厂) is a power station in the pre-permit stage in Alxa Left Banner, Alxa, Inner Mongolia, China. It is also known as 内蒙古华电腾格里外送基地项目.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Huadian Tengger power station Alxa Left Banner, Alxa, Inner Mongolia, China 40.642098, 106.265457 (approximate)

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 pre-permit coal: unknown 1000 ultra-supercritical 2025 (planned)
Unit 2 pre-permit coal: unknown 1000 ultra-supercritical 2026 (planned)
Unit 3 pre-permit coal: unknown 1000 ultra-supercritical 2026 (planned)
Unit 4 pre-permit coal: unknown 1000 ultra-supercritical 2026 (planned)

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Huadian (Inner Mongolia) New Energy Co Ltd [100%] China Huadian Group Corp [52.4%]; Huadian Power International Co Ltd [31.0%]; other [16.6%]
Unit 2 Huadian (Inner Mongolia) New Energy Co Ltd [100%] China Huadian Group Corp [52.4%]; Huadian Power International Co Ltd [31.0%]; other [16.6%]
Unit 3 Huadian (Inner Mongolia) New Energy Co Ltd [100%] China Huadian Group Corp [52.4%]; Huadian Power International Co Ltd [31.0%]; other [16.6%]
Unit 4 Huadian (Inner Mongolia) New Energy Co Ltd [100%] China Huadian Group Corp [52.4%]; Huadian Power International Co Ltd [31.0%]; other [16.6%]

Background

Huadian Tengger 4×1000MW coal power project will be used as a peak-shaving power supply for the Tengger Desert Clean Energy Base to support its electricity exports.[1]

The feasibility study was passed in March 2023.[2] Boiler, steam turbine, and generator procurement bidding was called in May 2023.[3]

In July 2023, Harbin Electric Machinery Co., Ltd. won a bid for plant's turbine generators and ancillary equipment.[4]

Articles and Resources

References

  1. "内蒙古4×100万千瓦火力发电项目签约". 北极星电力网. 2023-02-07.{{cite web}}: CS1 maint: url-status (link)
  2. 阿拉善左旗发展和改革委员会 (2023-03-21). "华电腾格里4×1000MW煤电项目初可研评审". 北极星火力发电网.{{cite web}}: CS1 maint: url-status (link)
  3. "内蒙古华电腾格里4×1000MW超超临界燃煤机组工程锅炉、汽轮机发电机采购招标". 北极星电力网. 2023-05-16.{{cite web}}: CS1 maint: url-status (link)
  4. 4台1000兆瓦 ! 哈电电机中标内蒙古华电腾格里汽轮发电机, BJX, 2023-07-11