Huadian Xisaishan power station (华电西塞山电厂) is an operating power station of at least 2020-megawatts (MW) in Wangjiadun, Xisaishan, Huangshi, Hubei, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Huadian Xisaishan power station | Wangjiadun, Xisaishan, Huangshi, Hubei, China | 30.203056, 115.180278 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 30.203056, 115.180278
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase I Unit 1 | operating | coal: anthracite | 330 | subcritical | 2004 |
Phase I Unit 2 | operating | coal: anthracite | 330 | subcritical | 2004 |
Phase II Unit 3 | operating | coal: bituminous | 680 | ultra-supercritical | 2010 |
Phase II Unit 4 | operating | coal: bituminous | 680 | ultra-supercritical | 2014 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | Hubei Huadian Xisai Mountain Power Generation Co Ltd [100%] | Meiya Yellowstone Power [49.0%]; Huadian Power International Co Ltd [41.3%]; other [9.7%] |
Phase I Unit 2 | Hubei Huadian Xisai Mountain Power Generation Co Ltd [100%] | Meiya Yellowstone Power [49.0%]; Huadian Power International Co Ltd [41.3%]; other [9.7%] |
Phase II Unit 3 | Hubei Huadian Xisai Mountain Power Generation Co Ltd [100%] | Meiya Yellowstone Power [49.0%]; Huadian Power International Co Ltd [41.3%]; other [9.7%] |
Phase II Unit 4 | Hubei Huadian Xisai Mountain Power Generation Co Ltd [100%] | Meiya Yellowstone Power [49.0%]; Huadian Power International Co Ltd [41.3%]; other [9.7%] |
Background
The power station consists of two 330 MW units (units 1-2) and two 680 MW units (units 3-4).[1]
Expansion
Unit 3 went online in 2010,[2] and Unit 4 in 2014.[3]
Articles and Resources
References
- ↑ "总投资23.24亿元湖北西塞火电厂二期项目获“路条”" accessed June 2013
- ↑ "华电湖北西塞山公司68万千瓦超超临界机组投产", 搜狐证券, 2010-12-27
- ↑ "春光美—湖北电建一公司华电西塞山电厂4号机组建设纪实", 中国电力建设集团有限公司, 2014-05-12