Huaneng Haikou power station (华能海口发电厂) is an operating power station of at least 660-megawatts (MW) in Laocheng Town, Chengmai, Haikou, Hainan, China with multiple units, some of which are not currently operating. It is also known as Haikou City power station (Phase I Unit 1, Phase I Unit 2, Phase III Unit 6, Phase III Unit 7, Phase IV Unit 8, Phase IV Unit 9, Phase V Unit 10, Phase V Unit 11), Haikou Macun Power Station (Phase II Unit 4, Phase II Unit 5).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Huaneng Haikou power station | Laocheng Town, Chengmai, Haikou, Hainan, China | 19.9600112, 110.0319297 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 4, Phase II Unit 5, Phase III Unit 6, Phase III Unit 7, Phase IV Unit 8, Phase IV Unit 9, Phase V Unit 10, Phase V Unit 11: 19.9600112, 110.0319297
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year |
---|---|---|---|---|---|---|
Phase I Unit 1 | Retired | coal: bituminous | 50 | subcritical | 1989 | 2008 |
Phase I Unit 2 | Retired | coal: bituminous | 50 | subcritical | 1989 | 2008 |
Phase II Unit 4 | Retired | coal: bituminous | 138 | subcritical | 1999 | 2020 |
Phase II Unit 5 | Retired | coal: bituminous | 138 | subcritical | 2000 | 2020 |
Phase III Unit 6 | Retired | coal: bituminous | 138 | subcritical | 1990 | 2010 |
Phase III Unit 7 | Retired | coal: bituminous | 138 | subcritical | 1990 | 2013 |
Phase IV Unit 8 | Operating | coal: bituminous | 330 | subcritical | 2006 | – |
Phase IV Unit 9 | Operating | coal: bituminous | 330 | subcritical | 2007 | – |
Phase V Unit 10 | Cancelled | coal: unknown | 660 | ultra-supercritical | – | – |
Phase V Unit 11 | Cancelled | coal: unknown | 660 | ultra-supercritical | – | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | Huaneng Hainan Power Generation Co Ltd Haikou Power Plant [100%] | Huaneng Power International Inc [91.8%]; unknown [8.2%] |
Phase I Unit 2 | Huaneng Hainan Power Generation Co Ltd Haikou Power Plant [100%] | Huaneng Power International Inc [91.8%]; unknown [8.2%] |
Phase II Unit 4 | Huaneng Hainan Power Generation Co Ltd Haikou Power Plant [100%] | Huaneng Power International Inc [91.8%]; unknown [8.2%] |
Phase II Unit 5 | Huaneng Hainan Power Generation Co Ltd Haikou Power Plant [100%] | Huaneng Power International Inc [91.8%]; unknown [8.2%] |
Phase III Unit 6 | Huaneng Hainan Power Generation Co Ltd Haikou Power Plant [100%] | Huaneng Power International Inc [91.8%]; unknown [8.2%] |
Phase III Unit 7 | Huaneng Hainan Power Generation Co Ltd Haikou Power Plant [100%] | Huaneng Power International Inc [91.8%]; unknown [8.2%] |
Phase IV Unit 8 | Huaneng Hainan Power Generation Co Ltd Haikou Power Plant [100%] | Huaneng Power International Inc [91.8%]; unknown [8.2%] |
Phase IV Unit 9 | Huaneng Hainan Power Generation Co Ltd Haikou Power Plant [100%] | Huaneng Power International Inc [91.8%]; unknown [8.2%] |
Phase V Unit 10 | Huaneng Hainan Power Generation Co Ltd Haikou Power Plant [100%] | Huaneng Power International Inc [91.8%]; unknown [8.2%] |
Phase V Unit 11 | Huaneng Hainan Power Generation Co Ltd Haikou Power Plant [100%] | Huaneng Power International Inc [91.8%]; unknown [8.2%] |
Background
Huaneng Haikou power station is owned by China Huaneng. Units 1-2 (50 MW each) were commissioned in 1989 and retired in 2008. Units 4-5 have a combined capacity of 276 MW and were commissioned in 1999-2000. Units 6-7 also have a combined capacity of 276 MW and were commissioned in 1990. Unit 6 was retired in 2010, and unit 7 in 2013.[1]
Huaneng owned majority shares of Zhonghai Energy in 2004, and Zhonghai Energy's Macun Power Plant (completed in 1990) became Units 4-5 of Huaneng Haikou Power Station, as well as units 8-9, completed in 2006-2007.[1]
Units 4-5 are planned for retirement in 2020.[2]
Expansion
China Huaneng has proposed adding 2 x 660 MW ultra-supercritical coal units at the power station (units 10-11). Although the project has yet to get permits, as of 2016 to 2017 there were multiple bids posted for its parts and construction.[3][2]
In 2019 it was reported the units would be gas-fired.[4]
Plant Details of units 1-8
- Sponsor: Huaneng Hainan Power Co Ltd
- Parent company: China Huaneng
- Location: Chengmai County, Hainan Province, China
- Coordinates: 19.9600112, 110.0319297 (exact)
- Status: Operating (Units 8-9); Retired (Units 1-7)
- Gross capacity: 660 MW (Units 8-9: 330 MW)
- Type: Subcritical
- Start year: 2007 (Unit 7), 2007 (Unit 8)
- Coal type: Bituminous
- Coal source:
- Source of financing:
Plant Details of units 10-11
- Sponsor: Huaneng Hainan Power Co Ltd
- Parent company: China Huaneng
- Location: Chengmai County, Hainan Province, China
- Coordinates: 19.9600112, 110.0319297 (exact)
- Status: Cancelled (will be gas-fired)
- Gross capacity: 1,320 MW (Units 9-10: 660 MW)
- Type: Ultra-supercritical
- Projected in service:
- Coal type:
- Coal source:
- Source of financing:
Articles and Resources
References
- ↑ 1.0 1.1 "中国华能集团公司海南分公司," China Huaneng, 2016-02-02
- ↑ 2.0 2.1 "海南发电海口电厂五期工程2台660兆 正文内容," china-zbycg.com, Jan 3, 2017
- ↑ "华能海口电厂五期工程2台660兆瓦超超临界煤电机组环境影响报告书编制招标公告," dlztb.net, Nov 18, 2016
- ↑ "洋浦天然气热电联产项目计划年内开建," Xinhua Net, 2019-10-19
Additional data