Huaneng Jilin Songyuan power station

From Global Energy Monitor

Huaneng Jilin Songyuan power station (华能松原燃机热电厂煤电项目(Unit 1 and Unit 2), 华能松原燃机热电厂, 华能松原燃机项目) is a power station in Songyuan, Jilin, China with multiple units of varying statuses, none of which are currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Huaneng Jilin Songyuan power station Songyuan, Jilin, China 45.1247, 124.7972 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP
1 Pre-construction[1][2] fossil gas: natural gas[3][1] 830[3][1] combined cycle[3][1] not found
2 Pre-construction[1][2] fossil gas: natural gas[1] 830[4][1] combined cycle[4][1] not found[4]
Unit 1 Cancelled coal: lignite 80 unknown
Unit 2 Cancelled coal: lignite 80 unknown

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 Huaneng Jilin Power Generation Co Ltd [100%][3][5][6] Huaneng Power International Inc [100.0%]
2 Huaneng Jilin Power Generation Co Ltd [100%][4][6] Huaneng Power International Inc [100.0%]
Unit 1 Huaneng Jilin Power Generation Co Ltd [100%] Huaneng Power International Inc [100.0%]
Unit 2 Huaneng Jilin Power Generation Co Ltd [100%] Huaneng Power International Inc [100.0%]

Background

In 2018, China Huaneng opened a bid for a "Huaneng Songyuan Gas Turbine Cogeneration Project Feasibility Study Report”. Plans included a 2 x 460 MW gas plant as well as two new 80 MW coal-fired units.[7]

In February 10, 2022, a plan of 830MW gas-fired unit was permitted by Jilin Provincial Development and Reform Commission.[8]

In the latest 2022 feasibility study bid, the project changed from 2*460MW of gas capacity and 2*80MW coal capacity to 1*830MW gas capacity. The coal units were presumed cancelled.

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://web.archive.org/web/20230403055244/https://news.bjx.com.cn/html/20220719/1242196.shtml. Archived from the original on 03 April 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240522212158/http://jldrc.jl.gov.cn/zfgk/zdjsxm/jggs/202401/t20240129_8867683.html. Archived from the original on 22 May 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20220708182105/https://news.bjx.com.cn/html/20220418/1218322.shtml. Archived from the original on 08 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 nan
  5. https://www.qcc.com/firm/32FJ098.shtml. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20220708194829/http://jldrc.jl.gov.cn/sgs/xzxkxx/202202/t20220214_8394780.html. Archived from the original on 08 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. Huaneng Group (June 22, 2018). "华能松原燃机热电联产项目可行性研究报告编制招标公告 - 招标资讯 - 勘测联合网". China UNSV. Retrieved 2021-05-28.{{cite web}}: CS1 maint: url-status (link)
  8. "吉发改审批〔2022〕21号—吉林省发展改革委关于华能松原燃机项目核准的批复", 吉林省发改委网站,February 14, 2022