Huaneng Tongxiang Gas Thermal power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Huaneng Tongxiang Gas Thermal power station (华能桐乡燃机热电厂, 华能桐乡燃机2号机组节能改造项目( Unit 2 Energy Saving Retrofit Project)) is an operating power station of at least 458-megawatts (MW) in Tongxiang, Linhang Economic Development Zone, Zhejiang, China with multiple units, some of which are not currently operating. It is also known as Huaneng Tongxiang Gas Turbine Unit 2 Energy Saving Retrofit Project (Unit 2 Energy Saving Retrofit Project).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Huaneng Tongxiang Gas Thermal power station | Tongxiang, Linhang Economic Development Zone, Zhejiang, China | 30.593104, 120.35733 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1, 2, Unit 2 Energy Saving Retrofit Project: 30.593104, 120.35733
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Operating[2] | fossil gas: natural gas[3] | 229[3] | combined cycle[3] | yes[2] | 2014[2] |
2 | Operating[2] | fossil gas: natural gas[3] | 229[3] | combined cycle[3] | yes[2] | 2014[2] |
Unit 2 Energy Saving Retrofit Project | Construction[4] | fossil gas: natural gas[4] | 60[4] | steam turbine[4] | yes[4] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Huaneng Tongxiang Gas Turbine Thermal Power Co Ltd [100%][2][4][5] | Huaneng Power International Inc [95.0%]; Tongxiang Linhang Economic Zone New Town Development and Construction Co Ltd [5.0%] |
2 | Huaneng Tongxiang Gas Turbine Thermal Power Co Ltd [100%][2][4][5] | Huaneng Power International Inc [95.0%]; Tongxiang Linhang Economic Zone New Town Development and Construction Co Ltd [5.0%] |
Unit 2 Energy Saving Retrofit Project | Huaneng Tongxiang Gas Turbine Thermal Power Co Ltd [100%][2][4][5] | Huaneng Power International Inc [95.0%]; Tongxiang Linhang Economic Zone New Town Development and Construction Co Ltd [5.0%] |
Articles and Resources
References
- ↑ https://www.qcc.com/firm/60a982d7e9fd03e2952d24c82fc99c9a.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 https://web.archive.org/web/20210927183232/https://hdjob.bjx.com.cn/companys/65875.html. Archived from the original on 27 September 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 https://web.archive.org/web/20210604214604/https://news.bjx.com.cn/html/20180418/892481-6.shtml. Archived from the original on 04 June 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 https://www.sohu.com/a/729864828_121613636.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://www.qcc.com/firm/36BMZ3T.shtml.
{{cite web}}
: Missing or empty|title=
(help)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.