Huaneng Yueyang power station (华能岳阳发电厂) is an operating power station of at least 2525-megawatts (MW) in Chenglingji, Yueyanglou District, Yueyang, Hunan, China with multiple units, some of which are not currently operating. It is also known as Huaneng Yuezhou power station.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Huaneng Yueyang power station | Chenglingji, Yueyanglou District, Yueyang, Hunan, China | 29.4497908, 113.1623018 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6, Phase IV Unit 7, Phase IV Unit 8: 29.4497908, 113.1623018
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase I Unit 1 | operating | coal: anthracite | 362.5 | subcritical | 1992 |
Phase I Unit 2 | operating | coal: anthracite | 362.5 | subcritical | 1992 |
Phase II Unit 3 | operating | coal: anthracite | 300 | subcritical | 2006 |
Phase II Unit 4 | operating | coal: anthracite | 300 | subcritical | 2006 |
Phase III Unit 5 | operating | coal: anthracite | 600 | ultra-supercritical | 2011 |
Phase III Unit 6 | operating | coal: anthracite | 600 | ultra-supercritical | 2012 |
Phase IV Unit 7 | cancelled | coal: anthracite | 1000 | ultra-supercritical | – |
Phase IV Unit 8 | cancelled | coal: anthracite | 1000 | ultra-supercritical | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | Huaneng Hunan Yueyang Power Generation Co Ltd [100%] | Huaneng Power International Inc [55.0%]; Meiya Xiangtou Power Co Ltd [22.5%]; Hunan Xiangtou Holding Group Co Ltd [19.0%]; Hunan Xingxiang Investment Holding Group Co Ltd [2.1%]; Hunan Caixin Financial Holding Group Co Ltd [1.4%] |
Phase I Unit 2 | Huaneng Hunan Yueyang Power Generation Co Ltd [100%] | Huaneng Power International Inc [55.0%]; Meiya Xiangtou Power Co Ltd [22.5%]; Hunan Xiangtou Holding Group Co Ltd [19.0%]; Hunan Xingxiang Investment Holding Group Co Ltd [2.1%]; Hunan Caixin Financial Holding Group Co Ltd [1.4%] |
Phase II Unit 3 | Huaneng International Power Co Ltd Yueyang Power Plant [100%] | Huaneng Power International Inc [100.0%] |
Phase II Unit 4 | Huaneng International Power Co Ltd Yueyang Power Plant [100%] | Huaneng Power International Inc [100.0%] |
Phase III Unit 5 | Huaneng Hunan Yueyang Power Generation Co Ltd [100%] | Huaneng Power International Inc [55.0%]; Meiya Xiangtou Power Co Ltd [22.5%]; Hunan Xiangtou Holding Group Co Ltd [19.0%]; Hunan Xingxiang Investment Holding Group Co Ltd [2.1%]; Hunan Caixin Financial Holding Group Co Ltd [1.4%] |
Phase III Unit 6 | Huaneng Hunan Yueyang Power Generation Co Ltd [100%] | Huaneng Power International Inc [55.0%]; Meiya Xiangtou Power Co Ltd [22.5%]; Hunan Xiangtou Holding Group Co Ltd [19.0%]; Hunan Xingxiang Investment Holding Group Co Ltd [2.1%]; Hunan Caixin Financial Holding Group Co Ltd [1.4%] |
Phase IV Unit 7 | Huaneng Hunan Yueyang Power Generation Co Ltd [100%] | Huaneng Power International Inc [55.0%]; Meiya Xiangtou Power Co Ltd [22.5%]; Hunan Xiangtou Holding Group Co Ltd [19.0%]; Hunan Xingxiang Investment Holding Group Co Ltd [2.1%]; Hunan Caixin Financial Holding Group Co Ltd [1.4%] |
Phase IV Unit 8 | Huaneng Hunan Yueyang Power Generation Co Ltd [100%] | Huaneng Power International Inc [55.0%]; Meiya Xiangtou Power Co Ltd [22.5%]; Hunan Xiangtou Holding Group Co Ltd [19.0%]; Hunan Xingxiang Investment Holding Group Co Ltd [2.1%]; Hunan Caixin Financial Holding Group Co Ltd [1.4%] |
Background
The plant is majority owned by China Huaneng. The six existing coal-fired units of Huaneng Yueyang power station, totaling 2,525 MW, were brought online between 1992 and 2011:[1]
Description of Expansion
Units 7-8
Huaneng was planning to build at least two additional coal-fired units of 1,000 MW, units 7 & 8, at this plant.[2][3]
The units were scheduled to be completed in 2017.[4][5][6]
However, with no developments since 2014, units 7-8 appear to be shelved.
Units 9-10
China Huaneng has also proposed an additional 2,000 MW of capacity at the power station - units 9 & 10 of 1,000 MW each.[7]
However, there have been no developments on units 9-10 since 2012, and plans appear to be abandoned.
Plant Details for Existing Units 1-6
- Operator: Huaneng Hunan Yueyang Power Generation Co., Ltd. 华能湖南岳阳发电有限责任公司[8]
- Sponsor: China Huaneng (55%), Hunan Xiangtou International Investment (45%)
- Parent: China Huaneng
- Location: Chenglingji, Yueyanglou District, Yueyang Prefecture, Hunan Province, China
- Coordinates: 29.4497908, 113.1623018 (exact)
- Status: Operating
- Gross capacity: 2,525 MW (Units 1 & 2: 363 MW; Units 3 & 4: 300 MW; Units 5 & 6: 600 MW)
- Type: Subcritical
- In service: 1992 (Units 1 & 2); 2006 (Units 3 & 4); 2011 (Unit 5); 2012 (Unit 6)
- Coal type:
- Coal source:
- Source of financing:
Articles and Resources
References
- ↑ "Huaneng Yueyang Coal Power Plant China," Global Energy Observatory, accessed October 2014
- ↑ Ailun Yang and Yiyun Cui, "Global Coal Risk Assessment: Data Analysis and Market Research," World Resources Institute working paper, November 2012
- ↑ “华能国际电力股份有限公司湖南分公司关于“新建华能湖南岳州电厂一期(2X1000MW)建设工程”的公示", 岳阳市人民政府,发改委办公室, 2014-06-11
- ↑ "湖南公示大型火电项目优选评议结果 华电平江电厂等上榜", 凤凰网资讯,滚动新闻, 2014-07-17
- ↑ "华能集团将在岳阳新建火电厂" accessed June 2013
- ↑ "蒙华铁路沿线煤电项目密集部署", 人民网,《中国能源报》第15版, 2014-04-14
- ↑ "Huaneng Yueyang Power Plant Phase IV expansion and siting new projects held in South Lake Hotel preliminary Matchmaking," yueyang.gov, 2012-05-16