Huay Bong wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: FKW Wind Farms (Phase 3), KR2 Wind Farms (Phase 2)
Huay Bong wind farm is an operating wind farm in Nakhon Ratchasima Province, Thailand.
Project Details
Table 1: Phase-level project details for Huay Bong wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
2 | Operating[1] | 2013[1] | 104 MW[1] | Onshore | Ratch Energy; Wind Energy Holding Company LTD; Chubu Electric Power Co Inc (中部電力株式会社)[1][1][1] | K.R.2 CO LTD[2] |
3 | Operating[1] | 2012[1] | 104 MW[1] | Onshore | RATCH Energy [100%][1] | First Korat CO LTD[2] |
Location
Table 2: Phase-level location details for Huay Bong wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
2 | Nakhon Ratchasima Province, Thailand[1] | 15.1502, 101.4601 (exact)[1] |
3 | Nakhon Ratchasima Province, Thailand[1] | 15.2103, 101.4635 (exact)[1] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 https://web.archive.org/web/20240125200414/https://windenergyholding.com/en/projects/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20210719232117/https://www.ratch.co.th/en/news/company-news/328/west-huay-bong-2-3-largest-wind-farm-in-sea-now-open. Archived from the original on 19 July 2021.
{{cite web}}
: Missing or empty|title=
(help)