Huayi Jinlong Cogen power station (新疆锦龙电力集团热电厂) is an operating power station of at least 200-megawatts (MW) in Tianbei New District, Kuitun, Ili, Xinjiang, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Huayi Jinlong Cogen power station Tianbei New District, Kuitun, Ili, Xinjiang, China 44.450508, 84.969886 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 44.450508, 84.969886

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 operating coal: unknown 100 unknown 2016
Unit 2 operating coal: unknown 100 unknown 2017

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Xinjiang Huayi Jinlong Thermal Power Co Ltd [100%] Shanghai Belloli Equity Investment Center LP [49.0%]; Xinjiang Production & Construction Corps Seventh Agricultural Division State-Own Ed Assets [35.1%]; Xinjiang Production and Construction Corps Electric Power Group Co Ltd [13.6%]; other [2.3%]
Unit 2 Xinjiang Huayi Jinlong Thermal Power Co Ltd [100%] Shanghai Belloli Equity Investment Center LP [49.0%]; Xinjiang Production & Construction Corps Seventh Agricultural Division State-Own Ed Assets [35.1%]; Xinjiang Production and Construction Corps Electric Power Group Co Ltd [13.6%]; other [2.3%]

Background

The Huayi Jinlong Cogen power station consists of two 100 MW units, commissioned in 2016 and 2017, respectively.[1][2] Construction for the power plant began in July 2015.[3] The Huayi Jinlong Cogen power station is a replacement for the now-retired Wenzhou Power Plant's two units in Tianbei New District Industrial Park, Kuitun City, Xinjiang. The Henan Engineering Company was contracted for project management, procurement, construction, installation engineering construction, and commissioning. The contract value was 1.05 billion yuan.[4]

The project is estimated to generate 1.5 billion kilowatt-hours of electricity per year and provide heating for an area of ​​4 million square meters, which will supply 230,000 people.[4]

It appears that the power plant was fined for a transgression in the storage of its fly ash, but it is unclear when the incident occurred, the impacts of the mishandling, and how much they were fined.[5]

Articles and Resources

References

  1. http://www.xjepdi.ceec.net.cn/art/2016/11/10/art_19871_1252696.html
  2. "新疆华仪锦龙热电有限公司_工商信息_失信信息-天下信用". www.tianxiaxinyong.com (in 中文(中国大陆)). Retrieved 2021-06-10.
  3. "河南二建新疆华仪锦龙热电工程2号机组开工建设_COSLOG工程_新浪博客". Sina News. August 17, 2015. Retrieved 2021-06-10.{{cite web}}: CS1 maint: url-status (link)
  4. 4.0 4.1 "新疆华仪锦龙热电工程2号机组通过满负荷试运行". www.hlfdw.com. August 31, 2017. Retrieved 2021-06-10.{{cite web}}: CS1 maint: url-status (link)
  5. "伊犁州生态环境局奎屯市分局行政处罚决定书". Xinjiang Kuitun Gov. Retrieved 2021-06-10.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.