Hubei Ezhou power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Hubei Ezhou power station (湖北能源鄂州发电厂) is an operating power station of at least 3960-megawatts (MW) in Gedian District, Huarong, Ezhou, Hubei, China with multiple units, some of which are not currently operating. It is also known as 中煤鄂州电厂四期(2×1000MW)扩建项目(Unit 7 & 8).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Hubei Ezhou power station | Gedian District, Huarong, Ezhou, Hubei, China | 30.5517656, 114.6420121 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6, Phase IV Unit 7, Phase IV Unit 8: 30.5517656, 114.6420121
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase I Unit 1 | operating | coal: unknown | 330 | subcritical | 1999 |
Phase I Unit 2 | operating | coal: unknown | 330 | subcritical | 2000 |
Phase II Unit 3 | operating | coal: unknown | 1000 | ultra-supercritical | 2019 |
Phase II Unit 4 | operating | coal: unknown | 1000 | ultra-supercritical | 2019 |
Phase III Unit 5 | operating | coal: anthracite | 650 | supercritical | 2009 |
Phase III Unit 6 | operating | coal: anthracite | 650 | supercritical | 2009 |
Phase IV Unit 7 | construction[1] | coal: unknown | 1000 | ultra-supercritical | 2025 (planned)[2] |
Phase IV Unit 8 | construction[1] | coal: unknown | 1000 | ultra-supercritical | 2026 (planned)[2] |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | Hubei Energy Group Ezhou Power Generation Co Ltd [100%] | Hubei Energy Group Co Ltd [60.0%]; Huaihe Energy Holding Group Co Ltd [24.9%]; China Coal Energy Co Ltd [10.0%]; other [2.6%]; China Cinda Asset Management Co Ltd [2.5%] |
Phase I Unit 2 | Hubei Energy Group Ezhou Power Generation Co Ltd [100%] | Hubei Energy Group Co Ltd [60.0%]; Huaihe Energy Holding Group Co Ltd [24.9%]; China Coal Energy Co Ltd [10.0%]; other [2.6%]; China Cinda Asset Management Co Ltd [2.5%] |
Phase II Unit 3 | Hubei Energy Group Ezhou Power Generation Co Ltd [100%] | Hubei Energy Group Co Ltd [60.0%]; Huaihe Energy Holding Group Co Ltd [24.9%]; China Coal Energy Co Ltd [10.0%]; other [2.6%]; China Cinda Asset Management Co Ltd [2.5%] |
Phase II Unit 4 | Hubei Energy Group Ezhou Power Generation Co Ltd [100%] | Hubei Energy Group Co Ltd [60.0%]; Huaihe Energy Holding Group Co Ltd [24.9%]; China Coal Energy Co Ltd [10.0%]; other [2.6%]; China Cinda Asset Management Co Ltd [2.5%] |
Phase III Unit 5 | Hubei Energy Group Ezhou Power Generation Co Ltd [100%] | Hubei Energy Group Co Ltd [60.0%]; Huaihe Energy Holding Group Co Ltd [24.9%]; China Coal Energy Co Ltd [10.0%]; other [2.6%]; China Cinda Asset Management Co Ltd [2.5%] |
Phase III Unit 6 | Hubei Energy Group Ezhou Power Generation Co Ltd [100%] | Hubei Energy Group Co Ltd [60.0%]; Huaihe Energy Holding Group Co Ltd [24.9%]; China Coal Energy Co Ltd [10.0%]; other [2.6%]; China Cinda Asset Management Co Ltd [2.5%] |
Phase IV Unit 7 | Hubei Energy Group Ezhou Power Generation Co Ltd [100%] | Hubei Energy Group Co Ltd [60.0%]; Huaihe Energy Holding Group Co Ltd [24.9%]; China Coal Energy Co Ltd [10.0%]; other [2.6%]; China Cinda Asset Management Co Ltd [2.5%] |
Phase IV Unit 8 | Hubei Energy Group Ezhou Power Generation Co Ltd [100%] | Hubei Energy Group Co Ltd [60.0%]; Huaihe Energy Holding Group Co Ltd [24.9%]; China Coal Energy Co Ltd [10.0%]; other [2.6%]; China Cinda Asset Management Co Ltd [2.5%] |
Project-level coal details
- Permit(s):
Background
The first four coal-fired units of Ezhou power station, totaling 1,960 MW, were brought online between 1999 and 2010. The plant is owned by Hubei Energy Group.[3]
Description of First Expansion (Units 5 & 6)
Hubei Energy Group is currently planning to build two additional coal-fired units at this plant, units 5-6, with a total planned capacity of 2,000 MW.[4][5][3]
The project received environmental clearance in June 2015,[6] and began construction in September 2015.[7]
Unit 5 was commissioned in April 2019.[8]
Unit 6
July 2017: Unit 6 postponed by government
In July 2017 China's NEA released the "Guideline of Supply-Side Reform of the Coal Power Bubble". The Guideline included a draft list which slowed down or halted 185 coal-burning units across 21 provinces, totaling 107 GW. 114 coal units (65 GW) are ordered to slow down the construction progress during 2017 to 2020, and are not allowed to connect to the grid in 2017. In addition, 71 coal units (42 GW) were halted indefinitely for regulation violations. The list partly overlapped with the projects listed in the January NEA letter to 13 provinces.[9]
Hubei Ezhou power station Unit 6 is among the postponed coal-burning units,[9] and also appeared on an updated list of postponed projects released in September 2017.[10]
For more information, see China's 2016/2017 Restrictions on Development of Coal-Fired Power Capacity.
May 2018: Construction continues on Unit 6
Construction continues on Unit 6 and as of late May 2018, photos on Google Earth show the project to be substantially complete.
June 2019: Unit 6 commissioned
Unit 6 was commissioned in June 2019.[11]
Expansion: Phase IV (Units 7 & 8)
In October 2022, it was reported that the municipal government and Hubei Energy Group Co., Ltd. had signed the "Hubei Energy Ezhou Power Plant Phase IV (2×1000MW) Expansion Project Investment Agreement."[12] The expansion would consist of two ultra-supercritical units.[12]
In January 2023, the Environmental Impact Assessment for the expansion was completed, [13] and the units were permitted shortly thereafter.[14]
Articles and Resources
References
- ↑ 1.0 1.1 https://news.bjx.com.cn/html/20240702/1386380.shtml.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20240125152039/https://mp.weixin.qq.com/s/AeNl9ax1DHOZ5E2Yr6BJmA. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 "湖北能源:关于投资建设鄂州电厂三期工程项目的公告", 凤凰网财经, 2013-06-26
- ↑ "湖北省2014-2015年大型火电项目建设选优评议结果公示", 湖北省发展和改革委员会, 2014-06-27
- ↑ "鄂州电厂三期工程安全预评价" Hubei Electric Power Survey & Design Institute, 2012-6-21
- ↑ "湖北能源集团股份有限公司关于投资建设鄂州电厂三期工程进展公告," 中国证券网, 2015-06-26
- ↑ "湖北能源集团鄂州电厂三期5号机组正式开工," 中国电力化工网, 2015-09-01
- ↑ "鄂州电厂三期2×1000MW燃煤机组扩建工程通过168试运," 规划设计集团, 2019/4/30
- ↑ 9.0 9.1 "16部委联合发文防范化解煤电产能过剩风险," Sohu.com, 2017-08-03
- ↑ "2017年分省煤电停建和缓建项目名单," Sohu, 2017-10-12
- ↑ "环保火电厂新典范!鄂州电厂两台百万机组双投," 中国能建, 2019-06-17
- ↑ 12.0 12.1 [https://news.bjx.com.cn/html/20221027/1264234.shtml
"湖北能源:拟投建鄂州电厂四期(2×1000MW)扩建项目,"] BJX, 2022-10-27 Cite error: Invalid
<ref>
tag; name "bjx1" defined multiple times with different content - ↑ 湖北能源鄂州电厂四期(2×1000MW)扩建项目环境影响评价首次信息公示 Hubei Energy Group Co, Jan. 4, 2023
- ↑ 湖北3个煤电大项目同日核准:4×1000MW+2×660MW! BJX, 2023-03-02
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.