Hubei Xiangbei Wind-Storage Integrated (Xiehe) wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Hubei Xiangbei Wind-Storage Integrated (Xiehe) wind farm is an operating wind farm in Huangji, Xiangzhou District, Xiangyang, Hubei, China.

Project Details

Table 1: Phase-level project details for Hubei Xiangbei Wind-Storage Integrated (Xiehe) wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1][2] 2024[2] 100 MW[3] Onshore[4] Hubei Tinghe New Energy Technology CO LTD [100%] (湖北霆合新能源科技有限公司)[5] Xiangyang Xiangbei Wind Power Generation CO LTD (襄阳襄北风力发电有限公司)[6]
2 Construction[7][8] 100 MW[8] Onshore[8] Xiehe Windpower Investment CO LTD [100%] (协合风电投资有限公司)[9] Xiangyang Huangbei Wind Power Generation CO LTD (襄阳黄北风力发电有限公司)[9]

Location

Table 2: Phase-level location details for Hubei Xiangbei Wind-Storage Integrated (Xiehe) wind farm

Phase Name Location Coordinates (WGS 84)
1 Huangji, Xiangzhou District, Xiangyang, Hubei, China[4] 32.3095, 112.1404 (approximate)[4]
2 Huangji, Xiangzhou District, Xiangyang, Hubei, China[10] 32.2868, 112.1283 (exact)[10]

The map below shows the locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240212090611/https://ccpa.com.cn/site/content/11973.html. Archived from the original on 12 February 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240325231503/https://hubei.zhaobiao.cn/proposed_v_15845704_o.html. Archived from the original on 25 March 2024. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240211084108/http://www.zgdlzb.org/news/202112/07/415067.html. Archived from the original on 11 February 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://web.archive.org/web/20220325054659/https://www.qcc.com/weblogin?back=%2Fcrun%2Fd74996d398591d5ab0b36711ce4074f1.html. Archived from the original on 25 March 2022. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20220325022059/https://www.qcc.com/weblogin?back=%2Ffirm%2Fd74996d398591d5ab0b36711ce4074f1.html. Archived from the original on 25 March 2022. {{cite web}}: Missing or empty |title= (help)
  6. (PDF) https://web.archive.org/web/20240207021638/https://www.ndrc.gov.cn/xxgk/zcfb/tz/202008/P020200805354037104994.pdf. Archived from the original (PDF) on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. https://web.archive.org/web/20240325231613/https://weibo.com/ttarticle/p/show?id=2309404905582237974688. Archived from the original on 25 March 2024. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 https://www.cnegroup.com/zh/bid/tender/2022-09-28/5197.html. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 https://web.archive.org/web/20240207025357/http://fgw.hubei.gov.cn/fbjd/zc/zcwj/tz/202110/t20211019_3815744.shtml. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  10. 10.0 10.1 https://www.cnegroup.com/zh/bid/tender/2022-09-28/5199.html. {{cite web}}: Missing or empty |title= (help)