Huguenot Underground Coal Mine

From Global Energy Monitor
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Huguenot Underground Coal Mine is a shelved coal mine in Quintette, British Columbia, Canada.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Huguenot Underground Coal Mine Quintette, British Columbia, Canada[1][2] 55.000742, -120.829716 (approximate)

The map below shows the approximate location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Project Type Opening Year Closing Year
Shelved Announced New

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
0[1] Underground[1] Longwall 75.92[2] 494* *

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
264.4[2] Peace River Bituminous[1] Met[2]

Table 5: Ownership and parent company

Owner Parent Company Headquarters
Colonial Coal International Corp[1] Colonial Coal International Corp [100%] Canada

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.

Background

Huguenot coal mine is a proposed surface and underground mine near Quintette, British Columbia, Canada.[3] It is owned by Canada-based Colonial Coal International Corporation.

According to Colonial Coal's website, "The Huguenot Coal Project covers a total area of 7,592 ha and consists of one contiguous block of 13 coal licenses and two coal license applications that encompass previously explored deposits. The property is located approximately 140 km from the Quintette load-out and is amenable to open-pit mining."[3]

The project includes an underground mine, which will produce 1.9 million tonnes per annum, and a surface mine slated to produce 2.7 million tonnes.[3]

While the project remains in the preliminary economic assessment stage, reports from the fiscal year ending July 31, 2024, reveal that the mine project is still active.[4]

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 (PDF) https://www.ccoal.ca/wp-content/uploads/2023/06/ccoal_presentation-2023-05-31.pdf. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://www.ccoal.ca/projects/huguenot/. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 Colonial Coal International Corporation (CCOAL), Huguenot, Company Website, accessed August 2020
  4. Management’s Discussion and Analysis of Financial Position and Results of Operations (“MD&A”) For the year ended July 31, 2024, Colonial Coal International Corporation website, Accessed March 2025.