Hultsfred solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Hultsfred solar farm is a solar photovoltaic (PV) farm under construction in Småland, Kalmar County, Sweden.
Project Details
Table 1: Phase-level project details for Hultsfred solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Construction[1][2] | 2025 (planned)[2] | 90 MWp/dc[2] | PV[3] | Alight AB; Neoen[2][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Hultsfred solar farm
Location | Coordinates (WGS 84) |
---|---|
Småland, Kalmar County, Sweden[2] | 57.526, 15.8233 (approximate)[2] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20240207001524/https://www.pv-magazine.com/2023/10/25/construction-starts-on-swedens-largest-solar-farm/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://web.archive.org/web/20240207065111/https://energynews.pro/en/hultsfred-from-neoen-and-alight-will-power-hm/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240207132802/https://list.solar/news/neoen-alight/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)