Hululais geothermal power plant

From Global Energy Monitor
This article is part of the
Global Geothermal Power Tracker, a Global Energy Monitor project.
Report an error

Hululais geothermal power plant is a geothermal power plant in pre-construction in Lebong Selatan, Bengkulu, Indonesia.

Project Details

Table 1: Unit-level project details for Hululais geothermal power plant

Unit name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Construction[1] 2024[2] 55 MW[1] Unknown type Pertamina Geothermal Energy [100%][3] Pertamina Geothermal Energy[3]
2 Pre-construction[3] 2026 (planned)[4] 55 MW[1] Unknown type Pertamina Geothermal Energy [100%][3] Pertamina Geothermal Energy[3]
Future units Announced[2] 230 MW[2] Unknown type Pertamina Geothermal Energy[2]

Location

Table 2: Unit-level location details for Hululais geothermal power plant

Unit name Location Coordinates (WGS 84)
1 Lebong Selatan, Bengkulu, Indonesia -3.2413, 102.2782 (exact)
2 Lebong Selatan, Bengkulu, Indonesia -3.2413, 102.2782 (exact)
Future units Lebong Selatan, Bengkulu, Indonesia -3.2413, 102.2782 (exact)

The map below shows the exact locations of the geothermal power plant units:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20220401170227/https://www.thinkgeoenergy.com/pln-now-starting-work-on-110-mw-hululais-geothermal-project/. Archived from the original on 01 April 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://www.power-technology.com/marketdata/power-plant-profile-hululais-geothermal-power-plant-indonesia/. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 https://web.archive.org/web/20221203062748/https://www.thinkgeoenergy.com/pge-targets-883-mw-geothermal-capacity-by-2024/. Archived from the original on 03 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. https://www.petromindo.com/news/article/hululais-geothermal-power-plant-to-start-ops-in-2026. {{cite web}}: Missing or empty |title= (help)