Huxian power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Huxian power station (大唐户县热电厂) is an operating power station of at least 600-megawatts (MW) in Yuxia Town, Hu, Xi'an, Shaanxi, China with multiple units, some of which are not currently operating. It is also known as 大唐户县第二热电厂; 大唐西安鄠邑热电公司 (Phase II Unit 1, Phase II Unit 2).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Huxian power station | Yuxia Town, Hu, Xi'an, Shaanxi, China | 34.07419, 108.61852 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 3, Phase I Unit 4, Phase I Unit 5, Phase II Unit 1, Phase II Unit 2: 34.07419, 108.61852
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year |
---|---|---|---|---|---|---|
Phase I Unit 3 | retired | coal: bituminous | 50 | subcritical | 1977 | 2008 |
Phase I Unit 4 | retired | coal: bituminous | 50 | subcritical | 1978 | 2008 |
Phase I Unit 5 | retired | coal: bituminous | 50 | subcritical | 1978 | 2008 |
Phase II Unit 1 | operating | coal: bituminous | 300 | subcritical | 2005 | – |
Phase II Unit 2 | operating | coal: bituminous | 300 | subcritical | 2005 | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 3 | Datang Shaanxi Power Generation Co Ltd Huxian Thermal Power Plant [100%] | China Datang Corp [100.0%] |
Phase I Unit 4 | Datang Shaanxi Power Generation Co Ltd Huxian Thermal Power Plant [100%] | China Datang Corp [100.0%] |
Phase I Unit 5 | Datang Shaanxi Power Generation Co Ltd Huxian Thermal Power Plant [100%] | China Datang Corp [100.0%] |
Phase II Unit 1 | Datang Shaanxi Power Generation Co Ltd Xi'an Thermal Power Plant [100%] | China Datang Corp [100.0%] |
Phase II Unit 2 | Datang Shaanxi Power Generation Co Ltd Xi'an Thermal Power Plant [100%] | China Datang Corp [100.0%] |
Background
Huxian power station began operating in 1957 in Hu County, Shaanxi Province. After 3 expansions, the total capacity reached 200 MW with 5 units. In the end of 2002, China Datang became its parent company, and continued working on its 4th expansion, known as Huxian-2 power station (大唐户县第二热电厂). The two new units with capacity of 300 MW each were brought online in 2005,[1] and had registered a new operating company as Datang Xi'an Huyi Thermal Power Company. (大唐西安鄠邑热电公司). The 5 older units were gradually retired till 2008. [2]
According to Platts, two more units totaling 600 MW, were completed in 2010. However, those units were not shown in photographs nor in web descriptions.[3][4]
Articles and Resources
References
- ↑ "全国投运燃煤机组脱硫设施清单," MEE, 2011
- ↑ 大唐户县热电厂 Baidu Baike
- ↑ "World Electric Power Plants Database,", Platts, June 2014. The database is not available online but can be purchased from Platts.
- ↑ "Huxian Datang Second Power Plant," Xi'an Continental Electric Power Design & Engineering Co., accessed December 2014
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.