Hyrasia One solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Hyrasia One solar farm is an announced solar photovoltaic (PV) farm in Karakiya District, Mangystau Region, Kazakhstan.
Project Details
Table 1: Phase-level project details for Hyrasia One solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
Enbek | Announced[1] | 2030 (planned)[2] | 1800 MW[3] | PV[3] | SVEVIND Energy GmbH [100%][4] |
Kanagat | Announced[1] | 2030 (planned)[2] | 4900 MW[3] | PV[3] | SVEVIND Energy GmbH [100%][4] |
Rahym | Announced[1] | 2030 (planned)[2] | 1600 MW[3] | PV[3] | SVEVIND Energy GmbH [100%][4] |
Talap | Announced[1] | 2030 (planned)[2] | 1300 MW[3] | PV[3] | SVEVIND Energy GmbH [100%][4] |
Teren oi | Announced[1] | 2030 (planned)[2] | 3500 MW[3] | PV[3] | SVEVIND Energy GmbH [100%][4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Hyrasia One solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
Enbek | Karakiya District, Mangystau Region, Kazakhstan[3] | 43.2460, 52.4636 (approximate)[3] |
Kanagat | Karakiya District, Mangystau Region, Kazakhstan[3] | 42.3000, 54.9479 (approximate)[3] |
Rahym | Karakiya District, Mangystau Region, Kazakhstan[3] | 43.3846, 55.2554 (approximate)[3] |
Talap | Karakiya District, Mangystau Region, Kazakhstan[3] | 43.7365, 52.5770 (approximate)[3] |
Teren oi | Karakiya District, Mangystau Region, Kazakhstan[3] | 42.4246, 53.0713 (approximate)[3] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://hyrasia.one/archive/23813209 https://hyrasia.one/the-project, https://hyrasia.one/archive/23813209.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 "Pre-FEED successfully started with first geological drillings". Archived from the original on 2024-06-12. Retrieved 2024-06-11.
{{cite web}}
: Text "Hyrasia One" ignored (help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 "The Project". Archived from the original on 2024-06-11. Retrieved 2024-06-11.
{{cite web}}
: Text "Hyrasia One" ignored (help) - ↑ 4.0 4.1 4.2 4.3 4.4 "About Us". Archived from the original on 2024-06-11. Retrieved 2024-06-11.
{{cite web}}
: Text "Hyrasia One" ignored (help)