Hyrasia One solar farm is an announced solar photovoltaic (PV) farm in Karakiya District, Mangystau Region, Kazakhstan.

Project Details

Table 1: Phase-level project details for Hyrasia One solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner
Enbek Announced[1] 2030 (planned)[2] 1800 MW[3] PV[3] SVEVIND Energy GmbH [100%][4]
Kanagat Announced[1] 2030 (planned)[2] 4900 MW[3] PV[3] SVEVIND Energy GmbH [100%][4]
Rahym Announced[1] 2030 (planned)[2] 1600 MW[3] PV[3] SVEVIND Energy GmbH [100%][4]
Talap Announced[1] 2030 (planned)[2] 1300 MW[3] PV[3] SVEVIND Energy GmbH [100%][4]
Teren oi Announced[1] 2030 (planned)[2] 3500 MW[3] PV[3] SVEVIND Energy GmbH [100%][4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Hyrasia One solar farm

Phase Name Location Coordinates (WGS 84)
Enbek Karakiya District, Mangystau Region, Kazakhstan[3] 43.2460, 52.4636 (approximate)[3]
Kanagat Karakiya District, Mangystau Region, Kazakhstan[3] 42.3000, 54.9479 (approximate)[3]
Rahym Karakiya District, Mangystau Region, Kazakhstan[3] 43.3846, 55.2554 (approximate)[3]
Talap Karakiya District, Mangystau Region, Kazakhstan[3] 43.7365, 52.5770 (approximate)[3]
Teren oi Karakiya District, Mangystau Region, Kazakhstan[3] 42.4246, 53.0713 (approximate)[3]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://hyrasia.one/archive/23813209 https://hyrasia.one/the-project, https://hyrasia.one/archive/23813209. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 "Pre-FEED successfully started with first geological drillings". Archived from the original on 2024-06-12. Retrieved 2024-06-11. {{cite web}}: Text "Hyrasia One" ignored (help)
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 "The Project". Archived from the original on 2024-06-11. Retrieved 2024-06-11. {{cite web}}: Text "Hyrasia One" ignored (help)
  4. 4.0 4.1 4.2 4.3 4.4 "About Us". Archived from the original on 2024-06-11. Retrieved 2024-06-11. {{cite web}}: Text "Hyrasia One" ignored (help)