IJmuiden Ver Beta Offshore wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Jmuiden Ver Zone, IJV Wind Farm Site, Jmuiden Ver Site III (Phase 3), Beta (formerly III-IV) (Phases 3, 4), Jmuiden Ver Site IV (Phase 4)
IJmuiden Ver Beta Offshore wind farm is a wind farm in pre-construction in Netherlands.
Project Details
Table 1: Phase-level project details for IJmuiden Ver Beta Offshore wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type |
---|---|---|---|---|
1 | Pre-construction[1] | 2028 (planned)[2] | 2000 MW[1] | Offshore hard mount[1] |
Location
Table 2: Phase-level location details for IJmuiden Ver Beta Offshore wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Netherlands[3] | 52.9046, 3.5827 (exact)[3] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 "Final Wind Farm Site Decisions for IJmuiden Ver Alpha and Beta published". 2023-12-29. Archived from the original on 2024-03-20. Retrieved 2024-02-15.
- ↑ "Port of Rotterdam to offer site suitable for green hydrogen plant". 2023-04-17. Archived from the original on 2024-03-20. Retrieved 2024-02-15.
- ↑ 3.0 3.1 "Kavelbesluit kavel Beta windenergiegebied IJmuiden Ver". zoek.officielebekendmakingen.nl. 2023-12-28. Archived from the original on 2024-03-20. Retrieved 2024-02-15.