Ia Pết Đắk Đoa wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Ia Pet-Dak Doa, Ia Pet Dak Doa 1/2 Wind Power Project
Ia Pết Đắk Đoa wind farm is an operating wind farm in Ia Pet, Đak Đoa, Gia Lai Province, Vietnam.
Project Details
Table 1: Phase-level project details for Ia Pết Đắk Đoa wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner |
---|---|---|---|---|---|
1 | Operating[1] | 2022[1] | 100 MW[1] | Onshore[1] | TRE Group [100%][2] |
2 | Operating[1] | 2022[1] | 100 MW[1] | Onshore[1] | TRE Group [100%][2] |
Location
Table 2: Phase-level location details for Ia Pết Đắk Đoa wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Ia Pet, Đak Đoa, Gia Lai Province, Vietnam[1] | 13.8885, 108.106 (approximate)[1] |
2 | Ia Pet, Đak Đoa, Gai Lai Province, Vietnam[1] | 13.8885, 108.106 (approximate)[1] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 https://web.archive.org/web/20240125202636/https://www.pecc1.com.vn/d4/news/Inauguration-Ceremony-of-Ia-Pet-Dak-Doa-1-2-Wind-Power-Projects-and-500kV-Pleiku-3-Substation-8-1847.aspx. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20240131115435/https://baogialai.com.vn/gia-lai-khan-truong-thi-cong-cac-du-an-dien-gio-post226399.html. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help)