Imanoyama wind farm (今ノ山風力発電所) is a wind farm in pre-construction in Mihara, Hata, Kochi Prefecture, Japan.
Project Details
Table 1: Phase-level project details for Imanoyama wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|
Pre-construction[1] | 2026 (planned)[2] | 195 MW[1] | Onshore[1] | Japan Wind Engineering CO LTD; Sumitomo CORP; Shikoku Electric Power Company INC; Hokutaku Renewable Energy Service (株式会社ジャパンウィンドエンジニアリング; 住友商事株式会社; 四国電力株式会社; 株式会社北拓)[3] | Imanoyama Wind LLC (今ノ山風力合同会社)[3] |
Location
Table 2: Phase-level location details for Imanoyama wind farm
Location | Coordinates (WGS 84) |
---|---|
Mihara, Hata, Kochi Prefecture, Japan[4][2][5] | 32.8552, 132.8522 (approximate)[2] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://www.city.tosashimizu.kochi.jp/kurashi/section/civil/14686.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://imanoyamawindfarm.co.jp/project/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://imanoyamawindfarm.co.jp/company/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ _K%C5%8Dchi
- ↑ https://en.wikipedia.org/wiki/Mihara.
{{cite web}}
: Missing or empty|title=
(help)