Inner Mongolia Baotou Jiyu Iron and Steel Co Ltd Guyang County

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Inner Mongolia Baotou Jiyu Iron and Steel Co Ltd Guyang County (包头市吉宇钢铁有限责任公司) is a blast furnace-basic oxygen furnace (BF-BOF) steel plant under construction in Baotou, Inner Mongolia, China.

Location

The map below shows the exact location of the plant in Baotou, Inner Mongolia, China:

Loading map...
  • Location: Guyang County, Baotou City, Inner Mongolia Autonomous Region
  • Coordinates (WGS 84): 40.901900, 110.336253 (exact)

Background

The plant is relocating from Hondlon district to Guyang county.[1]

Plant Details

Table 1: General Plant Details

Plant status Announced date Construction date Start date
Construction[2] 2021-10[3] 2022-09[2] 2023[3][4]

Table 2: Ownership and Parent Company Information

Parent company Parent company GEM ID Owner Owner company GEM ID
persons [51.0%]; Inner Mongolia Jiyu Holding (Group) Co Ltd [49.0%] E100000123261 [100%] Inner Mongolia Baotou Jiyu Iron and Steel Co., Ltd.[5] E100000126293

Table 3: Process and Products

Main production equipment Detailed production equipment
BF, BOF[3] 1 BOF (1x110-tonne)[3]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
construction 1250 TTPA[3] 1250 TTPA[3]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
construction 1130 TTPA[3] 1130 TTPA[3]

Blast Furnace Details

Table 6: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
unknown construction[2] 2021-10[3] 2022-09-01 00:00:00[2] 2023[3] 1200 m³[3] 1130[3] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "包头市吉宇钢铁实施整合搬迁绿色升级项目钢铁产能置换方案公告-我的钢铁网". m.mysteel.com (in 中文(中国大陆)). Retrieved 2024-12-08.
  2. 2.0 2.1 2.2 2.3 http://www.96369.net/news/1/572524.html. {{cite web}}: Missing or empty |title= (help)
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 https://web.archive.org/web/20220318214432/https://m.mysteel.com/21/1021/11/57AB82EA476B9D1B_abc.html. Archived from the original on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240115060134/https://www.steelx2.com/news/1/572524.html. Archived from the original on 15 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. https://www.qcc.com/firm/b68a37a8deec8ae237daa0ba810e3d1d.html. {{cite web}}: Missing or empty |title= (help)

Resources