Inner Mongolia Otog Front Banner Luneng Jiyun distributed wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Inner Mongolia Otog Front Banner Luneng Jiyun distributed wind farm (绿能吉云新能源鄂托克前旗二期10MW散式风力发电项目) is a wind farm in pre-construction in Aolezhaoqi Town, Otog Front Banner, Ordos, Inner Mongolia, China.

Project Details

Table 1: Phase-level project details for Inner Mongolia Otog Front Banner Luneng Jiyun distributed wind farm

Status Nameplate capacity Type Owner Operator
Pre-construction[1] 10 MW[2] Onshore[1] Inner Mongolia Weiling Energy Development CO LTD (内蒙古蔚领能源开发有限公司)[3] Inner Mongolia Green Energy Jiyun New Energy CO LTD (内蒙古绿能吉云新能源有限公司)[2]

Location

Table 2: Phase-level location details for Inner Mongolia Otog Front Banner Luneng Jiyun distributed wind farm

Location Coordinates (WGS 84)
Aolezhaoqi Town, Otog Front Banner, Ordos, Inner Mongolia, China[1] 38.1825, 107.4923 (approximate)[1]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 http://www.etkqq.gov.cn/2019gb/xwzx1/tzgg2019/202209/t20220913_3268138.html. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 http://www.21spv.com/news/show.php?itemid=170480. {{cite web}}: Missing or empty |title= (help)
  3. https://www.gongsi.com.cn/detail/e225da12-3ee7-362b-8851-25d531e6934a1. {{cite web}}: Missing or empty |title= (help)