Inner Mongolia Tuoketuo Thermal Power Phase 2 Helinge'er wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Inner Mongolia Tuoketuo Thermal Power Phase 2 Helinge'er wind farm (托克托发电公司大基地二期和林格尔项目) is an announced wind farm in Helinge'er County, Huhehaote Municipality, Inner Mongolia, China.

Project Details

Table 1: Phase-level project details for Inner Mongolia Tuoketuo Thermal Power Phase 2 Helinge'er wind farm

Status Nameplate capacity Mount type Owner
Announced[1] 300[1] Onshore Datang International Tuoketuo Power Generation CO LTD (大唐国际托克托发电有限责任公司)[1]

Location

Table 2: Phase-level location details for Inner Mongolia Tuoketuo Thermal Power Phase 2 Helinge'er wind farm

Location Coordinates (WGS 84)
Helinge'er County, Huhehaote Municipality, Inner Mongolia, China[1] 40.3820, 111.8216 (approximate)[1]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 http://www.cnpowerbid.com/news/show-201722.html. {{cite web}}: Missing or empty |title= (help)