Inner Mongolia Wulatezhong Banner (Guohua) Wind/Solar/Hydrogen/Ammonia complex
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Inner Mongolia Wulatezhong Banner (Guohua) Wind/Solar/Hydrogen/Ammonia complex is a wind farm under construction in Ganqimaodu, Urad Middle Banner, Bayannur, Inner Mongolia, China.
Project Details
Table 1: Phase-level project details for Inner Mongolia Wulatezhong Banner (Guohua) Wind/Solar/Hydrogen/Ammonia complex
Status | Commissioning year | Nameplate capacity | Type | Operator |
---|---|---|---|---|
Construction[1] | 2024 (planned)[1] | 800 MW[2] | Onshore[2] | Guohua Enerygy Investment CO LTD Western Inner Mongolia CO (国华能源投资有限公司蒙西公司)[2] |
Location
Table 2: Phase-level location details for Inner Mongolia Wulatezhong Banner (Guohua) Wind/Solar/Hydrogen/Ammonia complex
Location | Coordinates (WGS 84) |
---|---|
Ganqimaodu, Urad Middle Banner, Bayannur, Inner Mongolia, China[2] | 42.4031, 107.5798 (approximate)[2] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240218060704/https://www.163.com/dy/article/I2FKPTBP05562P0V.html. Archived from the original on 18 February 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240207033742/https://m.in-en.com/article/html/energy-2317328.shtml. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)