Intesar-Brega gas pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Intesar-Brega gas pipeline ,(خط غاز الإنتصار 103 (أ, is an operating gas pipeline in Libya.[1]
Location
The pipeline runs from Intesar Oil field in Sirte Basin to Mersa Brega in Al Wahat, Libya.
Pipeline Details
- Operator: Zueitina[2]
- Owner: Libyan National Oil Corporation [2]
- Parent Company: Libyan Government
- Capacity: 42.48 billion cubic meters per year
- Length: 333 km / 207 miles
- Diameter: 42 inches
- Status: Operating
- Start Year: 2010[2]
- Cost:
- Financing:
- Associated infrastructure:
Articles and resources
References
- ↑ Annual Statistics Bulletin, OPEC, 2012, p.75
- ↑ 2.0 2.1 2.2 Zueitina Admin. "مشروع نقل غاز حقل الإنتصار 103 أ إلى الشبكة الساحلية" (in العربية). Retrieved 2022-07-29.