Isaac Plains East Coal Mine

From Global Energy Monitor
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Isaac Plains East Coal Mine is a mothballed coal mine in Moranbah, Queensland, Australia.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Isaac Plains East Coal Mine Moranbah, Queensland, Australia -21.9718375, 148.1132931 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Mothballed[1] 2018[1]

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
2.379 Surface Open Pit 60* *

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
1.2[2] 2022[2] 34[2] Bowen Bituminous Met Dalrymple Bay Coal Terminal

Table 5: Ownership and parent company

Owner Parent Company Headquarters
Stanmore Resources Ltd[3] Stanmore Resources Ltd [100%] Indonesia

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.

Background

The Integrated Isaac Plains Project (also known as the Isaac Plains Complex) is a group of adjoining mines owned and operated by Stanmore Resources in Queensland, Australia. The complex includes the following mine sites: Isaac Downs, Isaac Plains, Isaac Plains East, Isaac Plains South, and Isaac Plains Underground.[4][5] Mining operations were initially commenced at the now-depleted Isaac Plains North deposit in late 2006.[6]

As of 2023, The Isaac Plains Complex is comprised of the Isaac Plains mine, which ceased operation in 2018; Isaac Plains East; Isaac Plains South; Isaac Downs coal mine, and the Isaac Plains underground mine site.[4] The mines are located approximately 7 kilometers south-east of the town of Moranbah in the Bowen Basin region of central Queensland. They are all owned by Stanmore Coal.

Over the years, several of these mines have served as the core mining operation site for the complex, including the Isaac Plains site, followed by Isaac Plains East and (currently) Isaac Downs.[5][7]

Stanmore reports that in financial year 2021, it invested $1.65 million in the rehabilitation of the Isaac Plains Complex; 56 hectares of land was recontoured, and 44 hectares was seeded for re-vegetation. To date, 39% of all disturbed land at Isaac Plains is already under rehabilitation.[7] Stanmore integrates this core activity with operations to ensure timely and efficient close out of rehabilitation.

As for upcoming projects, Stanmore reports that there exists an opportunity to develop the Isaac Plains Pit 5 North resource, which contains approximately 1.4Mt of ROM coal.[8]

Isaac Plains

Stanmore Resources acquired the Isaac Plains mine site in November 2015, after the operation was placed in care and maintenance in late 2014 by the previous owners.[4] Its mining operations recommenced in January 2016, then transitioned to the operations at Isaac Plains East from July 2018 through to January 2019. According to Stanmore, mining at this main site will cease in the first quarter of 2022.[7]

Isaac Plains East

During the late 2010s, most mining operations transitioned from the Isaac Plains mine site to Isaac Plains East. However, as of financial year 2022, the Isaac Plains Complex's core mining operations have transitioned from Isaac Plains East to Isaac Downs.[7] During financial year 2022, 212 hectares of land at Isaac Plains East underwent rehabilitation.[8]

Isaac Plains South

Isaac South is a proposed open-cut coal mine which sits immediately south of the Isaac Downs mine, on the southern side of the Isaac River. The most recent resource estimate for Isaac South was completed in June 2018 and includes a total coal resource of 52 million tonnes.[9]

Isaac Downs

The Isaac Downs coal mine is located 10 kilometers south of the existing Isaac Plains operations. It operates as an open-cut mining operation utilizing the existing Isaac Plains infrastructure Stanmore also owns the mine to the south of Isaac Plains and Isaac Plains East. In April 2022, EPSA Pacific took over as Isaac Downs' new mining operator.[8] Early during the financial year 2022 period, the dragline commenced operations at Isaac Downs at which point full scale production commenced.[8] Most mining operations now occur at Isaac Downs.[4]

Isaac Plains Underground

Isaac Plains Underground is a fully approved underground mine project, with approval granted in March 2019 by the Queensland Government.[9] The status of the underground development as of June 2020 was this: "The Bankable Feasibility Study completed in FY19 confirmed the financial viability of the Underground project with potential production of on average 1.2Mt saleable per annum from year 2 of the production plan.

  • Operator: Stanmore Resources Limited[4]
  • Owner: Stanmore Resources Limited[4]
  • Location: 7 kilometers east of Moranbah, Queensland, Australia[4]
  • GPS Coordinates: -21.9718375, 148.1132931 (exact for Isaac Plains mine)
  • Status: Isaac Downs, operating; Isaac Plains on care and maintenance; Isaac Plains East, operating; Isaac Plains South, proposed; and Isaac Plains Underground proposed;
  • Coal Production: 3.9 million tonnes per annum (FY2022)[8]
  • Total Resource: 160 million tonnes[8]
  • Mineable Reserves: 39 million tonnes (2022)[8]
  • Coal Type: Coking coal (Metallurgical & Thermal)[5]
  • Mine Size:
  • Mine Type: Open-cut and underground[5]
  • Start Year: 2006[6]
  • Source of Financing:

Contact details

Website: http://www.aquilaresources.com.au/go/projects/coal/isaac-plains-coal-mine

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20240205192239/https://stanmore.au/assets/operations/. Archived from the original on 05 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 (PDF) https://web.archive.org/web/20240205201457/https://www.annualreports.com/HostedData/AnnualReports/PDF/ASX_SMR_2022.pdf. Archived from the original (PDF) on 05 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. (PDF) https://web.archive.org/web/20240125052930/https://stanmore.au/wp-content/uploads/2023/04/Stanmore-Resources-Annual-Report-2022.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 Operations, Stanmore, accessed March 2023.
  5. 5.0 5.1 5.2 5.3 ISAAC PLAINS COMPLEX," Stanmore website, accessed June 2020.
  6. 6.0 6.1 [https://web.archive.org/web/20130512005254/http://www.aquilaresources.com.au/go/projects/coal/isaac-plains-coal-mine Isaac Plains Coal Mine], Aquila Resources website, Archived from the original on 12 May 2013, accessed March 2023.
  7. 7.0 7.1 7.2 7.3 Annual Report 2021, Stanmore Resources website, accessed March 2022.
  8. 8.0 8.1 8.2 8.3 8.4 8.5 8.6 Annual Report 2022, Stanmore Resources website, 27 Feb. 2023.
  9. 9.0 9.1 Projects, Stanmore, accessed January 2022.