Iskandariya Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Babylon solar park, Sama Iskandariya
Iskandariya Solar (محطة الإسكندرية للطاقة الشمسية) is a solar photovoltaic (PV) farm in pre-construction in Iskandariya, Babil/Babylon Governorate, Iraq.
Project Details
Table 1: Phase-level project details for Iskandariya Solar
Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|
Pre-construction[1] | 225 MWp/dc[2] | PV[3] | Al Bilal Group; Scatec ASA; Orascom Construction Industries SAE (OCI)[4][4][4] | Al Bilal Group; Scatec ASA; Orascom Construction Industries SAE (OCI)[4][4][4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Iskandariya Solar
Location | Coordinates (WGS 84) |
---|---|
Iskandariya, Babil/Babylon Governorate, Iraq[5] | 32.9001, 44.3501 (approximate)[5] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20240207145312/https://baghdadtoday.news/226402-%D8%A8%D9%8A%D9%86%D9%87%D8%A7-%D8%A7%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D8%B4%D9%85%D8%B3%D9%8A%D8%A9-%D9%88%D8%A7%D9%84%D8%B9%D9%81%D9%88-%D8%A7%D9%84%D8%B9%D8%A7%D9%85.-%D9%85%D8%AC%D9%84%D8%B3-%D8%A7%D9%84%D9%88%D8%B2%D8%B1%D8%A7%D8%A1-%D9%8A%D9%86%D9%87%D9%8A-%D8%AC%D9%84%D8%B3%D8%AA%D9%87-%D8%A8%D8%AD%D8%B2%D9%85%D8%A9-%D9%82%D8%B1%D8%A7%D8%B1%D8%A7%D8%AA-%D8%B9%D8%A7%D8%AC%D9%84.html. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240201113608/https://iraqenergy.org/2020/02/20/overview-of-iraqs-renewable-energy-progress-in-2019/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240207110430/https://www.power-technology.com/marketdata/scatec-karbala-solar-pv-park-iraq/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 https://web.archive.org/web/20240201114105/https://energy-utilities.com/consortium-signs-contracts-to-develop-525mw-of-news114644.html. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20240206221115/https://latitude.to/articles-by-country/iq/iraq/57267/iskandariya. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)