Ivanovskie CHP-4 power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Ivanovskie CHP-4 power station (Ивановские ПГУ) is an operating power station of at least 325-megawatts (MW) in Komsomolsk, Ivanovo Oblast, Russia with multiple units, some of which are not currently operating. It is also known as Ivanovskaya GRES (former name), Ivanovskie PSU, IVANOV-4.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Ivanovskie CHP-4 power station Komsomolsk, Ivanovo Oblast, Russia 57.0231, 40.3848 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 1, 1R, 2: 57.0231, 40.3848

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
1 Retired[2][3][4] fossil gas: natural gas, fossil liquids: diesel[4] 325[4] combined cycle[4] yes[4] 2008[4] 2022[5][2][3]
1R Construction[6][2][3][7][8] fossil gas: natural gas[8] 325[8] combined cycle[7][8][9] yes[9] 2024[7][8][10][11]
2 Operating[4] fossil gas: natural gas, fossil liquids: diesel[4] 325[12] combined cycle[4] yes[4] 2012[4]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 Inter RAO – Electric Power Generation JSC [100%][8][4] Inter RAO PJSC [100.0%]
1R Inter RAO – Electric Power Generation JSC [100%][8][4] Inter RAO PJSC [100.0%]
2 Inter RAO – Electric Power Generation JSC [100%][8][4] Inter RAO PJSC [100.0%]

Background

The power station was built at the premises of the Ivanovskaya GRES power station.[13] Unit 1 was commissioned in May 2008, and Unit 2, in June 2012. Since 2013, the plant's installed electric capacity has been 325 MW (unit No. 2 is in operation, unit No. 1 has been permanently mothballed).[14] In July 2021, the company has announced its plans to refurbish Unit 1 and bring it back into operation.[15] This additional capacity increase has also appeared in the Ministry of Energy 2021-2027 energy program published in February 2021, with the expected start-up date of 2024,[16] and in the 2022-2028 energy program released in February 2022, with the expected start-up date of 2024.[17]

In February 2022, the general director of the station confirmed the company's intent to continue realizing the project of refurbishing Unit 1 in 2022.[18] As of June 2022, it appears that construction of Unit 1R was ongoing.[19][20] In July 2022, various equipment for this project has been stored at the plant's storage facilities.[21] According to Russian Ministry of Energy 2023-2028 energy program released in February 2023, the replacement of Unit 1 will be completed in 2024.[22]In March 2023, it was mentioned in the media that implementation of the project at the Ivanovo CHP was in progress and according to the schedule.[23] The Ministry of Energy 2024-2029 energy program published in November 2023 includes the project with the commissioning date in 2024.[24] As of April 2024, there have not been any further updates.

Articles and Resources

References

  1. https://web.archive.org/web/20210831002344/https://www.industryabout.com/country-territories-3/2137-russia/fossil-fuels-energy/32580-ivanovskaya-tec-4-gas-power-plant. Archived from the original on 31 August 2021. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://m.vk.com/wall-26075741_958. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://m.vk.com/wall-26075741_981. {{cite web}}: Missing or empty |title= (help)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 https://web.archive.org/web/20220708160817/https://irao-generation.ru/en/stations/ivanovopg/. Archived from the original on 08 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. https://web.archive.org/web/20220906004838/https://irao-generation.ru/stations/ivanovopg/. Archived from the original on 06 September 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. (PDF) https://web.archive.org/web/20240506233407/http://www.quartz-group.ru/upload/iblock/a8b/2ir2qh9o26qqcbekfi25z8iwptj1czj6/QuartzGroup_01_38_2023_w.pdf. Archived from the original (PDF) on 06 May 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. 7.0 7.1 7.2 https://web.archive.org/web/20221130155326/https://www.garant.ru/products/ipo/prime/doc/404487690/. Archived from the original on 30 November 2022. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 https://web.archive.org/web/20210908202213/https://minenergo.gov.ru/system/download-pdf/20706/156298. Archived from the original on 08 September 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  9. 9.0 9.1 https://web.archive.org/web/20220708161728/http://gazeta-zarya.ru/2021/07/29/%D0%B8%D0%B2%D0%B0%D0%BD%D0%BE%D0%B2%D1%81%D0%BA%D0%B8%D0%B5-%D0%BF%D0%B3%D1%83-%D1%83%D0%B2%D0%B5%D0%BB%D0%B8%D1%87%D0%B8%D0%BB%D0%B8-%D0%B2%D1%8B%D1%80%D0%B0%D0%B1%D0%BE%D1%82%D0%BA%D1%83-%D1%8D-2/. Archived from the original on 08 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  10. (PDF) https://web.archive.org/web/20230313035802/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2023/final/13_Ivanovskaja_oblast_fin.pdf. Archived from the original (PDF) on 13 March 2023. {{cite web}}: Missing or empty |title= (help)
  11. (PDF) https://web.archive.org/web/20240506233308/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2024/final/13_Ivanovskaja_oblast.pdf. Archived from the original (PDF) on 06 May 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  12. https://web.archive.org/web/20220927042540/http://adm-komsomolsk.ru/oao-inter-rao-elektrogeneraciya.html. Archived from the original on 27 September 2022. {{cite web}}: Missing or empty |title= (help)
  13. "Ивановские ПГУ". irao-generation.ru. Retrieved May 10, 2024.{{cite web}}: CS1 maint: url-status (link)
  14. "Ивановские ПГУ". irao-generation.ru. Archived from the original on June 16, 2021. Retrieved Oct 25, 2022.
  15. "Ивановские ПГУ увеличили выработку электроэнергии". Gazeta Zarya. Jul 29, 2021. Retrieved Apr 15, 2022.
  16. "minenergo.gov.ru/system/download-pdf/20706/156298". Archived from the original on September 8, 2021.
  17. "Приказ Министерства энергетики РФ от 28 февраля 2022 г. № 146 "Об утверждении схемы и программы развития Единой энергетической системы России на 2022 - 2028 годы"". Garant.ru. Feb 28, 2022. Retrieved Oct 25, 2022.{{cite web}}: CS1 maint: url-status (link)
  18. "Ивановские ПГУ в 2021 году удвоили выработку электроэнергии". Gazeta-zarya.ru. Feb 15, 2022. Retrieved Oct 25, 2022.
  19. "На Ивановских ПГУ ведётся монтаж топливного резервуара". vk.com. Jun 27, 2022. Retrieved Oct 25, 2022.
  20. "Кровлю энергоблока №1 Ивановских ПГУ покрыли современным мембранным покрытием". vk.com. Aug 23, 2022. Retrieved Oct 25, 2022.
  21. "На Ивановских ПГУ завершены работы по строительству «холодного» склада. Новое сооружение появилось на промплощадке". vk.com. Jul 27, 2022. Retrieved Oct 25, 2022.
  22. "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2023–2028 ГОДЫ ИВАНОВСКАЯ ОБЛАСТЬ" (PDF). SO UPS of Russia. February 28, 2023. Retrieved November 9, 2023.{{cite web}}: CS1 maint: url-status (link)
  23. "Ремонтная компания 2023 года - старт дан" (PDF). Вестник Ремонта. March 2023. Retrieved April 23, 2024.{{cite web}}: CS1 maint: url-status (link)
  24. "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2024–2029 ГОДЫ. ЭНЕРГОСИСТЕМА ИВАНОВСКОЙ ОБЛАСТИ" (PDF). SO UPS of Russia. November 2023. Retrieved April 23, 2024.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.