Ivanovskie CHP-4 power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Ivanovskie CHP-4 power station (Ивановские ПГУ) is an operating power station of at least 325-megawatts (MW) in Komsomolsk, Ivanovo Oblast, Russia with multiple units, some of which are not currently operating. It is also known as Ivanovskaya GRES (former name), Ivanovskie PSU, IVANOV-4.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Ivanovskie CHP-4 power station | Komsomolsk, Ivanovo Oblast, Russia | 57.0231, 40.3848 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1, 1R, 2: 57.0231, 40.3848
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
1 | Retired[2][3][4] | fossil gas: natural gas, fossil liquids: diesel[4] | 325[4] | combined cycle[4] | yes[4] | 2008[4] | 2022[5][2][3] |
1R | Construction[6][2][3][7][8] | fossil gas: natural gas[8] | 325[8] | combined cycle[7][8][9] | yes[9] | 2024[7][8][10][11] | – |
2 | Operating[4] | fossil gas: natural gas, fossil liquids: diesel[4] | 325[12] | combined cycle[4] | yes[4] | 2012[4] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Inter RAO – Electric Power Generation JSC [100%][8][4] | Inter RAO PJSC [100.0%] |
1R | Inter RAO – Electric Power Generation JSC [100%][8][4] | Inter RAO PJSC [100.0%] |
2 | Inter RAO – Electric Power Generation JSC [100%][8][4] | Inter RAO PJSC [100.0%] |
Background
The power station was built at the premises of the Ivanovskaya GRES power station.[13] Unit 1 was commissioned in May 2008, and Unit 2, in June 2012. Since 2013, the plant's installed electric capacity has been 325 MW (unit No. 2 is in operation, unit No. 1 has been permanently mothballed).[14] In July 2021, the company has announced its plans to refurbish Unit 1 and bring it back into operation.[15] This additional capacity increase has also appeared in the Ministry of Energy 2021-2027 energy program published in February 2021, with the expected start-up date of 2024,[16] and in the 2022-2028 energy program released in February 2022, with the expected start-up date of 2024.[17]
In February 2022, the general director of the station confirmed the company's intent to continue realizing the project of refurbishing Unit 1 in 2022.[18] As of June 2022, it appears that construction of Unit 1R was ongoing.[19][20] In July 2022, various equipment for this project has been stored at the plant's storage facilities.[21] According to Russian Ministry of Energy 2023-2028 energy program released in February 2023, the replacement of Unit 1 will be completed in 2024.[22]In March 2023, it was mentioned in the media that implementation of the project at the Ivanovo CHP was in progress and according to the schedule.[23] The Ministry of Energy 2024-2029 energy program published in November 2023 includes the project with the commissioning date in 2024.[24] As of April 2024, there have not been any further updates.
Articles and Resources
References
- ↑ https://web.archive.org/web/20210831002344/https://www.industryabout.com/country-territories-3/2137-russia/fossil-fuels-energy/32580-ivanovskaya-tec-4-gas-power-plant. Archived from the original on 31 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://m.vk.com/wall-26075741_958.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 https://m.vk.com/wall-26075741_981.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 https://web.archive.org/web/20220708160817/https://irao-generation.ru/en/stations/ivanovopg/. Archived from the original on 08 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220906004838/https://irao-generation.ru/stations/ivanovopg/. Archived from the original on 06 September 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240506233407/http://www.quartz-group.ru/upload/iblock/a8b/2ir2qh9o26qqcbekfi25z8iwptj1czj6/QuartzGroup_01_38_2023_w.pdf. Archived from the original (PDF) on 06 May 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 https://web.archive.org/web/20221130155326/https://www.garant.ru/products/ipo/prime/doc/404487690/. Archived from the original on 30 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 https://web.archive.org/web/20210908202213/https://minenergo.gov.ru/system/download-pdf/20706/156298. Archived from the original on 08 September 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 9.0 9.1 https://web.archive.org/web/20220708161728/http://gazeta-zarya.ru/2021/07/29/%D0%B8%D0%B2%D0%B0%D0%BD%D0%BE%D0%B2%D1%81%D0%BA%D0%B8%D0%B5-%D0%BF%D0%B3%D1%83-%D1%83%D0%B2%D0%B5%D0%BB%D0%B8%D1%87%D0%B8%D0%BB%D0%B8-%D0%B2%D1%8B%D1%80%D0%B0%D0%B1%D0%BE%D1%82%D0%BA%D1%83-%D1%8D-2/. Archived from the original on 08 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20230313035802/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2023/final/13_Ivanovskaja_oblast_fin.pdf. Archived from the original (PDF) on 13 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240506233308/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2024/final/13_Ivanovskaja_oblast.pdf. Archived from the original (PDF) on 06 May 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220927042540/http://adm-komsomolsk.ru/oao-inter-rao-elektrogeneraciya.html. Archived from the original on 27 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Ивановские ПГУ". irao-generation.ru. Retrieved May 10, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Ивановские ПГУ". irao-generation.ru. Archived from the original on June 16, 2021. Retrieved Oct 25, 2022.
- ↑ "Ивановские ПГУ увеличили выработку электроэнергии". Gazeta Zarya. Jul 29, 2021. Retrieved Apr 15, 2022.
- ↑ "minenergo.gov.ru/system/download-pdf/20706/156298". Archived from the original on September 8, 2021.
- ↑ "Приказ Министерства энергетики РФ от 28 февраля 2022 г. № 146 "Об утверждении схемы и программы развития Единой энергетической системы России на 2022 - 2028 годы"". Garant.ru. Feb 28, 2022. Retrieved Oct 25, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Ивановские ПГУ в 2021 году удвоили выработку электроэнергии". Gazeta-zarya.ru. Feb 15, 2022. Retrieved Oct 25, 2022.
- ↑ "На Ивановских ПГУ ведётся монтаж топливного резервуара". vk.com. Jun 27, 2022. Retrieved Oct 25, 2022.
- ↑ "Кровлю энергоблока №1 Ивановских ПГУ покрыли современным мембранным покрытием". vk.com. Aug 23, 2022. Retrieved Oct 25, 2022.
- ↑ "На Ивановских ПГУ завершены работы по строительству «холодного» склада. Новое сооружение появилось на промплощадке". vk.com. Jul 27, 2022. Retrieved Oct 25, 2022.
- ↑ "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2023–2028 ГОДЫ ИВАНОВСКАЯ ОБЛАСТЬ" (PDF). SO UPS of Russia. February 28, 2023. Retrieved November 9, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Ремонтная компания 2023 года - старт дан" (PDF). Вестник Ремонта. March 2023. Retrieved April 23, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2024–2029 ГОДЫ. ЭНЕРГОСИСТЕМА ИВАНОВСКОЙ ОБЛАСТИ" (PDF). SO UPS of Russia. November 2023. Retrieved April 23, 2024.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.