JK2 wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Jemeiwaa Kai, Apotolorru, JK2

JK2 wind farm (Parque Eólico Apotolorru) is a wind farm in pre-construction in Uribia, La Guajira, Colombia.

Project Details

Table 1: Phase-level project details for JK2 wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Pre-construction[1] 2025 (planned)[2] 75 MW[3] Onshore[1] AES Corp [100%][1] AES[1]

Location

Table 2: Phase-level location details for JK2 wind farm

Phase Name Location Coordinates (WGS 84)
1 Uribia, La Guajira, Colombia[3] 11.9917, -71.6769 (approximate)[3]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240125171559/https://www.energiaestrategica.com/finalmente-el-gobierno-colombiano-adjudico-nueve-centrales-renovables-por-1-365-mw-y-ahora-proyecta-una-nueva-subasta-para-2020/. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  2. (PDF) https://web.archive.org/web/20240125171541/https://www1.upme.gov.co/siel/Seguimiento_proyectos_generacion/Informe_Avance_proyectos_Generacion_Marzo_2023.pdf. Archived from the original (PDF) on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 "Inscripción de proyectos de generación". SIEL. 2023. Archived from the original on 2024-01-25. Retrieved 2023-10-09.