JSW Ispat Special Products Raigarh steel plant, also known as Monnet Ispat & Energy Limited Raigarh; JISPL Raigarh, is a blast furnace (BF), direct reduced iron (DRI) and electric arc furnace (EAF) steel plant operating in Raigarh, Chhattisgarh, India.

Location

The map below shows the exact location of the plant in Raigarh, Chhattisgarh, India:

Loading map...
  • Location: Village & Post - Naharpalli, Tehsil - Kharsia, Raigarh 496661, Chhattisgarh, India
  • Coordinates (WGS 84): 21.983709, 83.238133 (exact)

Background

The JSW Ispat Special Products Raigarh steel plant was established in 1994 by Monnet Ispat & Energy Limited, whose name was later changed to JSW Ispat Special Products Limited in 2020, after being acquired by JSW Steel in August 2018 following near-bankruptcy.[1][2] Prior to acquisition the plant was shut for over four years.[3]

In 2020, a blast occurred at the plant which killed two employees and injured two others.[4]

In 2021, the National Green Tribunal (NGT) formed a five-member committee to investigate citizens' reports about environmental norm violations at the Raigarh plant. The committee will research whether there has been non-compliance with the Water and Air Acts and Hazardous Waste Management Rules, and/or damage to agriculture and destruction of nearby mangroves.[5]

In June 2021, five employees working at the plant were injured and burned after hot ash fell on them.[6]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Start date Workforce size Power source
Main plant Operating[7][8] 1994[9] 1052[10] Captive power plant (174 MW)[11]
Expansion Construction[12] 2020[13] 2023[14]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Main plant JSW Ispat Special Products Ltd [100%] 4295873687 [100%] E100000001753 [53.2%]; E100001010147 [15%]; E100001010148 [11%]; E100001000520 [7.5%]; E100001000521 [5.9%]; E100001010037 [0.9%]; E100001010033 [0.8%]; E100001010034 [0.7%]; E100001010036 [0.6%]; E100001010035 [0.6%]; E100001001119 [0.6%] JSW Ispat Special Products Ltd[7] 4295873687 E100000120868

Table 3: Process and Products

Phase Steel product category Steel products Steel sector end users ISO 14001 Main production equipment Detailed production equipment
Main plant semi-finished; finished rolled[15] HR plates, rebars, structure profiles, pig iron, pellets, sponge iron, billets, ferroalloys[15][10] automotive; building and infrastructure; tools and machinery; transport[10] yes[10] BF, DRI, EAF[15] 2 EAF (100-tonne, 750ttpa each); pellet plant; 6 DRI (350 ton each)[15][16][11]
Expansion semi-finished; finished rolled[17] slab, hot rolled, cold rolled and galvanised coil[17] automotive; building and infrastructure; steel packaging[18] yes[10] EAF[12] EAF[12]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating 950 TTPA[8][19] 950 TTPA[8][19]
Expansion construction 250 TTPA[14] 250 TTPA[14]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Blast furnace capacity Sponge iron/DRI capacity Nominal iron capacity (total)
Main plant operating 620 TTPA[20] 580 TTPA[20][20][20][20][20][20] 1200 TTPA[20][20][20][20][20][20][20]
Expansion construction

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Phase Ferronickel Sinter Pellets
Main plant 220 TTPA[10] 960 TTPA[21] 2200 TTPA[15][22]
Expansion

Table 7: Actual Crude Steel Production by Year (thousand tonnes per annum)

Year EAF Production Total (all routes)
2020 320 TTPA[10] 320 TTPA
2021 314 TTPA[22] 314 TTPA
2022 420 TTPA[23] 420 TTPA

Table 8: Actual Crude Iron Production by Year (thousand tonnes per annum)

Year BF Production DRI Production Total (all routes)
2020 155 TTPA[10] 721 TTPA[10] 876 TTPA
2021 135 TTPA[22] 299 TTPA[22] 434 TTPA
2022

Blast Furnace Details

Table 9: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
unknown operating[24][15] unknown unknown 2013[19] 550 m³[19] 620[20] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "JSW Ispat Special Products Limited". JSW Ispat. Archived from the original on January 2, 2022. Retrieved January 15, 2022.
  2. Chaliawala, Nehal (2022-02-17). "JSW Ispat to transfer commodity-grade steel business to new subsidiary Mivaan Steels in a slump sale". The Economic Times. Retrieved 2022-02-27.
  3. "JSW Ispat Special Products Ltd.: Corporate Presentation" (PDF). BSE India. July 2021. Retrieved 14 December, 2023. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  4. Das, R. Krishna (2020-06-12). "Blast at JSPL's Raigarh plant kills two workers, two others injured". Business Standard India. Retrieved 2022-02-27.
  5. Press Trust of India (2021-05-29). "NGT forms panel to probe violation of environmental norms by JSW in Raigarh". Business Standard India. Retrieved 2022-02-27.
  6. "Chhattisgarh: Five steel plant staffers suffer burns after hot ash falls on them". The New Indian Express. 2021-06-20. Retrieved 2022-02-27.{{cite web}}: CS1 maint: url-status (link)
  7. 7.0 7.1 https://web.archive.org/web/20240219011833/https://www.aionjsw.in/. Archived from the original on 19 February 2024. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 (PDF) https://web.archive.org/web/20220108035637/https://www.teriin.org/sites/default/files/2020-03/Towards%20a%20Low%20Carbon%20Steel%20Sector%20Report.pdf. Archived from the original (PDF) on 08 January 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  9. https://web.archive.org/web/20220102120028/https://www.aionjsw.in/. {{cite web}}: Check |archive-url= value (help); Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 10.4 10.5 10.6 10.7 10.8 https://web.archive.org/web/20220129211812/https://www.aionjsw.in/documents/default.aspx?f. Archived from the original (PDF) on 29 January 2022. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 (PDF) https://web.archive.org/web/20240110022637/https://www.aionjsw.in/uploads/products/ec-complaince-report-oct-21-to-mar-22.pdf. Archived from the original (PDF) on 10 January 2024. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 https://web.archive.org/web/20240110021654/https://mnacritique.mergersindia.com/jsw-ispat-special-products-merger-aion-slump-sale/. Archived from the original on 10 January 2024. {{cite web}}: Missing or empty |title= (help)
  13. https://web.archive.org/web/20240110021814/https://uk.marketscreener.com/quote/stock/JSW-ISPAT-SPECIAL-PRODUCT-46729193/news/Monnet-Ispat-Energy-to-Undertake-Expansion-of-Steel-Plant-33976517/. Archived from the original on 10 January 2024. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 (PDF) https://web.archive.org/web/20221222183438/https://www.jsw.in/sites/default/files/assets/industry/creixent-special-steels-limited/JSW_Ispat_2022.pdf. Archived from the original (PDF) on 22 December 2022. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 15.2 15.3 15.4 15.5 (PDF) https://web.archive.org/web/20220129215924/https://www.jsw.in/sites/default/files/assets/industry/creixent-special-steels-limited/Monnet_Ispat_and_Energy_Ltd_%20Annual%20report_%2018-19.pdf. Archived from the original (PDF) on 29 January 2022. {{cite web}}: Missing or empty |title= (help)
  16. (PDF) https://web.archive.org/web/20220623112807/http://ibm.gov.in/writereaddata/files/05222018175300Ironandsteelandscrap2016.pdf. Archived from the original (PDF) on 23 June 2022. {{cite web}}: Missing or empty |title= (help)
  17. 17.0 17.1 https://web.archive.org/web/20220619114921/https://www.tatasteeleurope.com/construction/sustainability/performance-at-our-sites/port-talbot. Archived from the original on 19 June 2022. {{cite web}}: Missing or empty |title= (help)
  18. https://www.tatasteeleurope.com/about-us/sites-and-facilities. {{cite web}}: Missing or empty |title= (help)
  19. 19.0 19.1 19.2 19.3 https://web.archive.org/web/20220401034543/https://www.oecd.org/officialdocuments/publicdisplaydocumentpdf/?cote=DSTI/SU/SC(2014)16/FINAL&docLanguage=En. Archived from the original on 01 April 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  20. 20.00 20.01 20.02 20.03 20.04 20.05 20.06 20.07 20.08 20.09 20.10 20.11 20.12 20.13 20.14 (PDF) https://web.archive.org/web/20240110023939/https://www.bseindia.com/xml-data/corpfiling/AttachHis/7e6da37e-cf37-4c87-884d-e4c4f97dc392.pdf. Archived from the original (PDF) on 10 January 2024. {{cite web}}: Missing or empty |title= (help)
  21. (PDF) https://web.archive.org/web/20210917094515/https://www.aionjsw.in/documents/default.aspx?f=pressreleases/pdf/file-124.pdf. Archived from the original (PDF) on 17 September 2021. {{cite web}}: Missing or empty |title= (help)
  22. 22.0 22.1 22.2 22.3 (PDF) https://web.archive.org/web/20240125050629/https://www.aionjsw.in/documents/default.aspx?f=investor-relations/annual-report-202122-186.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  23. (PDF) https://web.archive.org/web/20240111064236/https://www.jswsteel.in/sites/default/files/assets/industry/steel/IR/press-release-Q4-2023.pdf. Archived from the original (PDF) on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  24. https://www.argusmedia.com/en/news/2391092-indias-jispl-restarts-blast-furnace-in-chhattisgarh. {{cite web}}: Missing or empty |title= (help)

Resources