JSW JFE Electrical Bellary Steel plant is a steel plant in unknown, Ballari, Karnataka, India that operates steelmaking technology.
Location
The map below shows the approximate location of the plant in unknown, Ballari, Karnataka, India:
- Location: unknown
- Coordinates (WGS 84): 15.042769, 76.445529 (approximate)
Background
In October 2023, JSW Steel announced its intention to create a low-carbon steel production enterprise by 2030. The production capacity of the enterprise will be 4 million tons per year, production is planned to start by 2030. The project will be implemented in two stages. The first phase (with a capacity of up to 2 million tons per year) should be completed shortly before 2030, the second phase of construction will continue and may take another one or two years. JSW’s investment in the facility will be in addition to the INR 10,000 crore (US $1.34 billion) the company has earmarked for its plans to transition to green energy solutions.[1]
In February 2024, JFE Steel Corporation and JSW Steel Limited established JSW JFE Electrical Steel Private Limited, a joint venture company for grain-oriented electrical steel in India and held a groundbreaking ceremony on February 12 at a site in Bellary in Karnataka, India. The facility is expected to start production by fiscal 2027.[2][3]
Plant Details
Table 1: General Plant Details
Announced date | Start date | Power source | Iron ore source | Coal source |
---|---|---|---|---|
2023-10-27[4] | 2027[5] | unknown | unknown | unknown |
Table 2: Ownership and Parent Company Information
State-owned entity status | Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|---|
Partial | JFE Holdings Inc; JSW Steel Ltd | 4295880726; 4295872888 | E100000000643; E100001000516 | JSW JFE Electrical Steel Pvt Ltd[5] | 5090711853 | E100002004553 |
Table 3: Process and Products
Main production equipment |
---|
Steel other/unspecified |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Other/unspecified steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
announced | 4000[4] | 4000[4] |
Unit Details
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "JSW Steel is considering green steel production — News — GMK Center". GMK. 1698405285. Retrieved 2025-01-21.
{{cite web}}
: Check date values in:|date=
(help) - ↑ "JFE Steel Corporation". JFE Steel Corporation. 2024-02-13. Retrieved 2025-01-21.
- ↑ "JSW Steel signs joint venture with JFE Steel". Steel Times International. Retrieved 2025-01-21.
- ↑ 4.0 4.1 4.2 https://gmk.center/en/news/jsw-steel-is-considering-green-steel-production/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://www.jfe-steel.co.jp/en/release/2024/02/240213.html.
{{cite web}}
: Missing or empty|title=
(help)