JSW Utkal Steel Odisha plant
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
JSW Utkal Steel Odisha plant, also known as JUSL, is a blast furnace-basic oxygen furnace (BF-BOF) steel plant under construction in Paradip, Odisha, India.
Location
The map below shows the exact location of the plant in Paradip, Odisha, India:
- Location: Paradip, Odisha, India
- Coordinates (WGS 84): 20.259383, 86.648200 (exact)
Background
JSW Utkal Steel Limited (JUSL) was formed to set up an integrated 13.5 mtpa steel plant and a 900 MW captive power plant in Odisha. According to JSW Steel Integrated report 2022-23, the plant is yet to commence operations.[1]
The project estimated at a cost of INR 65,000 crores is being developed in three phases:
- Phase I involves installation of a blast furnace with 4500 mtpa iron making capacity, setting up steel melting shop-I (SMS-I) housing two 350 ton Basic Oxygen furnaces (BOF) and auxiliary facilities including pellet plant, coke oven, sinter plant and product mills.
- Phase II plans to add another blast furnace to increase ironmaking capacity to 9000 mtpa, increase capacity of SMS-I to 10.5 mtpa by adding another 350 ton BOF and increase auxiliary capacities with additional pellet plant, coke ovens and product mills.
- Phase II increases the ironmaking capacity to 13500 mtpa by adding a third blast furnace. A second Steel Melting Shop (SMS-II) of 3 mtpa capacity will be set up with two 180 ton BOFs. At this phase, a 1.2 mtpa coke oven gas based direct reduced ironmaking plant will also be set up that will feed the BOFs in addition to auxiliary capacities including a pellet plant, coke ovens and product mills.[2]
On August 13, 2018, JSW Steel applied for environmental clearance and was granted terms of reference on March 19, 2019. A public hearing was held on December 20, 2019. In 2020, the Odisha government transferred 2,700 acres of land to JSW Steel, which was earlier reserved for a failed 2013 South Korean POSCO project.[3] On 11 April, 2022, JSW Steel received the environmental clearance for setting up the 13.2 mtpa greenfield integrated steel plant from the Union Ministry of Environment & Forest and Climate Change (MoEF&CC).[4][5] On 17 March 2023, the ground-breaking ceremony of the pellet plant was held at the plant.[6]
In March 2023, National Green Tribunal and Odisha High court stayed the environmental clearance stating that the Odisha government is diverting land protected by Forest Rights Act, 2006, following protests by local bodies.[7][8] In June 2023, MoEF&CC asked JSW Steel to submit a fresh proposal for review, addressing concerns related to use of scarce fresh water from Mahanadi river and other pollution concerns and to develop a detailed environment management plan.[9]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Construction date | Start date | Power source | Iron ore source | Coal source |
---|---|---|---|---|---|---|---|
Main plant | Construction[10] | 2017-09-27[11] | 2023-03-17[10] | 2026[12][13] | JSW Utkal Steel power station Unit 1 - G115666, L104954 (300 MW)[13][14] | Joda-Barbil, Koira and Nayagarh mines [15] | Imports possibly from Mozambique, Australia and Canada |
Expansion | Announced[16][12] | 2017-09-27[11] | – | 2029[12][13] | JSW Utkal Steel power station Unit 2 - G115667, L104954 (300MW)[13][14] | Joda-Barbil, Koira and Nayagarh mines [15] | Imports possibly from Mozambique, Australia and Canada |
Expansion | Announced[16][12] | 2017-09-27[11] | – | 2032[12][13] | JSW Utkal Steel power station Unit 3 - G115668, L104954 (300MW)[13][14] | Joda-Barbil, Koira and Nayagarh mines [15] | Imports possibly from Mozambique, Australia and Canada |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|---|
Main plant | JSW Steel Ltd [100.0%] | 4295872888 [100%] | E100000001753 [53.2%]; E100001010147 [15%]; E100001010148 [11%]; E100001000520 [7.5%]; E100001000521 [5.9%]; E100001010037 [0.9%]; E100001010033 [0.8%]; E100001010034 [0.7%]; E100001010036 [0.6%]; E100001010035 [0.6%]; E100001001119 [0.6%] | JSW Utkal Steel Ltd[16] | 5073682427 | E100001000528 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Main production equipment | Detailed production equipment |
---|---|---|---|---|
Main plant | semi-finished; finished rolled[15] | HR coil/sheets/strips, CR coils, sheets, electrical steel, tin plate, rebars, wire rods, medium sections[15] | BF, BOF[12] | 1 BF (4.5 mtpa); 2 BOF (350 ton each); Pellet plant (2 8mtpa); Coke oven (4 62 ovens); Sinter Plant (5.775 mtpa)[12][15] |
Expansion | semi-finished; finished rolled[15] | HR coil/sheets/strips, CR coils, sheets, electrical steel, tin plate, rebars, wire rods, medium sections[15] | BF, BOF[12] | 1 BF (4.5 mtpa); 1 BOF (350 ton); Pellet plant (8 mtpa); Coke oven (2 62 ovens)[12][15] |
Expansion | semi-finished; finished rolled[15] | HR coil/sheets/strips, CR coils, sheets, electrical steel, tin plate, rebars, wire rods, medium sections[15] | BF, DRI, BOF[12] | 1 BF (4.5 mtpa); 1 DRI (1.2 mtpa); 2 BOF (180 ton each); Pellet plant (8 mtpa); Coke oven (2 62 ovens)[12][15] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | announced | 7000 TTPA[13][15] | 7000 TTPA[13][15] |
Expansion | announced | 3500 TTPA[13] | 3500 TTPA[13] |
Expansion | announced | 3000 TTPA[13][15] | 3000 TTPA[13][15] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Blast furnace capacity | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|---|---|
Main plant | announced | 4500 TTPA[13] | – | 4500 TTPA[13] |
Expansion | announced | 4500 TTPA[13] | – | 4500 TTPA[13] |
Expansion | announced | 4500 TTPA[13] | 1200 TTPA[13] | 5700 TTPA[13][13] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Phase | Sinter | Coke | Pellets |
---|---|---|---|
Main plant | 5775 TTPA[13] | 3000 TTPA[13] | 16000 TTPA[13] |
Expansion | – | 1500 TTPA[13] | 8000 TTPA[13] |
Expansion | – | 1500 TTPA[13] | 8000 TTPA[13] |
Blast Furnace Details
Table 7: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|
1 | announced[16][12] | 2017[11] | unknown | 2026[12][13] | 5350 m³[13] | 4500[13] | unknown | unknown |
2 | announced[16][12] | 2017[11] | unknown | 2029[12][13] | 5350 m³[13] | 4500[13] | unknown | unknown |
3 | announced[16][12] | 2017[11] | unknown | 2032[12][13] | 5350 m³[13] | 4500[13] | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "A Future shaped by steel: JSW Steel integrated report 2022-23" (PDF). JSW Steel. Retrieved 28 September, 2023.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "JSW Utkal Steel Limited: Techno-economic feasibility report" (PDF). MoEFCC, Government of India. February 2021. Retrieved 29 September, 2023.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "Land acquisition for JSW project to be done in 5 months: Odisha govt". Business Standard. 18 April, 2022. Retrieved 29 September, 2023.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link) - ↑ "JSW Utkal Steel receives environmental clearance from MoEF&CC for 13.2 MTPA Greenfield Steel Plant in Odisha" (PDF). JSW. 11 April, 2022. Retrieved 29 September, 2023.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link) - ↑ "JSW Utkal Steel gets environment clearance for new plant". BusinessLine. Retrieved 2023-09-29.
- ↑ NEWS, OMMCOM (2023-03-17). "Ground-Breaking Ceremony Of Pellet Plant For JSW Utkal Steel Held | Odisha". Odisha News, Odisha Breaking News, Odisha Latest News. Retrieved 2023-12-11.
- ↑ "NGT, Orissa HC Red-Flag Green Signal to JSW Steel Project | NewsClick". NewsClick. 2023-03-29. Retrieved 2023-09-29.
- ↑ adititandon. "NGT stays environmental clearance for JSW project in Odisha, protestors relieved". india.mongabay.com. Retrieved 2023-09-29.
- ↑ "Govt seeks fresh proposal from JSW Steel for Odisha unit, says source - InformistMedia". InformistMedia. 2023-06-16. Retrieved 2023-09-29.
- ↑ 10.0 10.1 https://web.archive.org/web/20230328072930/https://ommcomnews.com/odisha-news/ground-breaking-ceremony-of-pellet-plant-for-jsw-utkal-steel-held. Archived from the original on 28 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 11.4 11.5 (PDF) https://web.archive.org/web/20220120165231/https://www.jsw.in/sites/default/files/assets/downloads/steel/IR/Financial%20Performance/Annual%20Reports%20Steel/JSW_Steel_IR_2018-19_Final.pdf. Archived from the original (PDF) on 20 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.00 12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11 12.12 12.13 12.14 12.15 12.16 (PDF) https://web.archive.org/web/20220111173338/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2021.pdf. Archived from the original (PDF) on 11 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.00 13.01 13.02 13.03 13.04 13.05 13.06 13.07 13.08 13.09 13.10 13.11 13.12 13.13 13.14 13.15 13.16 13.17 13.18 13.19 13.20 13.21 13.22 13.23 13.24 13.25 13.26 13.27 13.28 13.29 13.30 13.31 13.32 13.33 13.34 13.35 (PDF) http://environmentclearance.nic.in/writereaddata/online/EC/290820211p0v0e0jzql25210445TEFR.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 https://web.archive.org/web/20230406150503/https://www.gem.wiki/JSW_Utkal_Steel_power_station. Archived from the original on 06 April 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 15.00 15.01 15.02 15.03 15.04 15.05 15.06 15.07 15.08 15.09 15.10 15.11 15.12 15.13 15.14 15.15 (PDF) https://environmentclearance.nic.in/writereaddata/online/EC/290820211p0v0e0jzql25210445TEFR.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 16.0 16.1 16.2 16.3 16.4 16.5 (PDF) https://web.archive.org/web/20211004131951/https://www.jsw.in/sites/default/files/assets/downloads/steel/IR/Financial%20Performance/Annual%20Reports%20Steel/20-21/AR%202020-21.pdf. Archived from the original (PDF) on 04 October 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)